Planning Permission Ireland
GrantedRetentionDecided 15 August 2019

3, Kilbarrack Gardens, Dublin 5

Retention of changes to a previously approved extension, including a boundary wall and layout alterations.

3311/19 · Dublin City Council · Lodged 21 June 2019

Reference
3311/19
Authority
Dublin City Council
Register status
Appealed
Type
Retention Permission
Received
21 June 2019

Summary

AI-generated

Retention permission is sought for modifications to a previously approved development. These changes include a 2.6-metre-high rear boundary wall supporting a roof overhang, an enlarged first-floor shower room, and a smooth render finish instead of brickwork on the side extension.

Retentionretentionalterations

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Retention: permission for changes to facilitate alterations to the previous proposal which is permitted under planning permission app ref. 4538/17 and an bord pleanala app ref abp-301192-18 which consists of a 2.6 metre high boundary wall supporting a roof over-hang at the bedroom double doors to the rear, an increase in the floor area to the first floor shower room and change of external finish from brickwork to smooth render to new side extension at front of dwelling.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
86 Kilbarrack Rd, Sutton, Dublin 5Apr 2025€610,000146 m
16 Thornville Ave, Kilbarrack, Dublin 5Feb 2026€498,000157 m
90 Kilbarrack Rd, Raheny, Dublin 5Mar 2025€570,000161 m
5 St Margarets Ave, Raheny, Dublin 5Apr 2025€700,000219 m
8 Roncalli Road, Baldoyle, Dublin 13Jan 2025€975,000228 m
15 Greendale Avenue, Kilbarrack, Dublin 5Oct 2025€682,000253 m
9 Thornville Dr, Kilbarrack, Dublin 5Apr 2026€495,000278 m
4 Pacelli Ave, Sutton, Dublin 13Aug 2025€757,500289 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 June 2019
  2. Decision due15 August 2019
  3. Decision issued15 August 2019
  4. Grant issued29 November 2019
  5. Appeal submitted12 September 2019
  6. Appeal decided29 November 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.