Planning Permission Ireland
GrantedAlterationsDecided 15 August 2019

10, Mountpleasant Square, Dublin 6

Refurbishment, structural repairs, and internal alterations to a Georgian dwelling.

3314/19 · Dublin City Council · Lodged 21 June 2019

Reference
3314/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
21 June 2019

Summary

AI-generated

The development consists of the refurbishment and structural repair of an existing Georgian dwelling, including floor upgrades and window replacements. It also includes a new pitched roof to the rear extension, internal layout alterations, and general decorative works.

Alterationsrefurbishmentheritagegeorgian

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the development will consist of: - refurbishment and structural repair of existing georgian dwelling including structural upgrading of floors, modification of basement window opening, and replacement of all non-original windows with timber up and down sash windows. - re-slating of existing roofs, repair of rainwater goods and chimneys - modification of first floor door opening to rear facade to form a sash window - new pitched roof to existing flat roof rear extension - removal of sloped floorboards in entry hall and restoration of original level - internal alterations to remove existing ensuite bathrooms - subdivision of rear first floor bedroom to provide additional bathroom - restore original opening between rooms at entrance floor level - reinstatement of original ceiling level in second-floor bedroom - general refurbishment and decorative works including installation of new plumbing and heating system, electrical rewiring, refurbishment of existing joinery, and damp treatment to existing basement walls.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 15 June 2020.

Notified floor area: 280

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
30 Mountpleasant Terrace, Ranelagh, Dublin 6May 2026€1,200,00099 m
22 Ranelagh Rd, Ranelagh, Dublin 6Jun 2026€1,350,000110 m
20a Mountpleasant Ave Lwr, Ranelagh, Dublin 6Aug 2025€1,535,000112 m
Basement Apt, 16 Upper Mount Pleasant Ave, Ranelagh Dublin 6Sept 2025€350,608121 m
16 Upper Mount Pleasant Ave, Ranelagh, Dublin 6Sept 2025€749,392121 m
63 Ranelagh Road, Ranelagh, Dublin 6Dec 2025€1,880,000126 m
32 Mount Pleasant Square, Ranelagh, Dublin 6Apr 2025€1,435,000126 m
44 Mountpleasant Terrace, Ranelagh, Dublin 6Jun 2026€625,500133 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 June 2019
  2. Decision due15 August 2019
  3. Decision issued15 August 2019
  4. Grant issued23 September 2019

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.