Planning Permission Ireland
InvalidExtensionDecided 20 March 2023

38, Merlyn Park, Ballsbridge, Dublin 4, D04K4P1

Demolition of a garage and rear extension to build a two-storey side and rear extension with a new dormer window.

3315/23 · Dublin City Council · Lodged 6 March 2023

Reference
3315/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
6 March 2023

Summary

AI-generated

The project involves demolishing a flat-roofed side garage and a single-storey rear extension. It will construct a two-storey side and rear extension, a part single-storey rear extension, and a new zinc-clad dormer window to form an attic bedroom.

Extensionextensiondormerdemolition

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission: to demolish existing flat roofed garage to side of dwelling and demolition of rear single storey extension to rear elevation of dwelling house and construction of (i) two-storey extension to side and rear of existing dwelling house and part single storey extension to rear of dwelling. (ii) removal of existing roof lights from rear elevation of roof and replacement with zinc clad dormer window at second floor level to form new attic bedroom (iii) widen existing entrance gate to 3.0m wide and all associated site works.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
51 St Johns Park Ave, Sandymount, Dublin 4Feb 2025€1,141,522145 m
46 St Johns, Sandymount, Dublin 4Feb 2025€925,000171 m
21 Merrion Court, Ballsbridge, Dublin 4May 2025€750,000181 m
10 Merrion Court, Ailesbury Rd, Ballsbridge Dublin 4Apr 2026€745,000181 m
8 Houses At, Merrion Gardens, BallsbridgeApr 2025€10,796,361198 m
Apt 27 The Gardens At Elmpark Green, Merrion Road, Dublin 4price excludes VATJan 2025€638,767198 m
Apt 14 The Gardens At Elmpark Green, Merrion Road, Dublin 4price excludes VATMay 2025€603,524198 m
Apt 70 The Gardens At Elmpark Green, Merrion Road, Dublin 4price excludes VATMar 2025€687,224198 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 March 2023
  2. Decision due28 April 2023
  3. Decision issued20 March 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.