Planning Permission Ireland
GrantedCommercialDecided 14 April 2022

21, Ship Street Great, Dublin 8

Amendments to a permitted hotel on Ship Street Great, including solar panels and lift overrun adjustments.

3331/22 · Dublin City Council · Lodged 21 February 2022

Reference
3331/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
21 February 2022

Summary

AI-generated

The proposed development seeks amendments to a previously permitted 153-bedroom hotel. The changes include the installation of solar panels at roof level and height adjustments to two lift overruns, with no changes to the overall footprint or floor area.

Commercialhotelsolarroof
Floor area
909 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development to amend a previously permitted 153 no. Bedroom hotel (reg. Ref. 2701/16; abp ref. 247947-17, as amended by reg. Ref. 3157/18, reg. Ref. 4326/19, reg. Ref. 2811/20, reg. Ref. 4376/19; abp ref. 306573-20) on this site of c. 909 sq. M at no. 21 ship street great, dublin
  • The development will consist of amendments to the permitted roof level of the permitted hotel development and comprising: a) inclusion of solar panels at roof level; b) adjustment of heights to the
  • No lift overruns at roof level. The overall footprint and gross floor area of the building will remain unchanged

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 13 July 2021. A completion certificate was lodged on 12 February 2024.

Notified floor area: 6,326

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
31 Castleway Chancery Lane, Dublin 8, DublinMay 2025€565,00094 m
28 Castleway, Golden Lane, Dublin 8Jun 2026€535,00094 m
36 The Olde Dock, Little Ship St, Christchurch Dublin 8Apr 2025€260,000117 m
29 The Olde Dock, Ship St Little, Dublin 8Feb 2026€269,000117 m
Apt 38 Chancery Court, Chancery Lane, Bride StFeb 2026€727,000123 m
Apt 45, Chancery Court, Bride St Dublin 8Feb 2025€590,000123 m
19 Chancery Court, Bride St, DublinMar 2026€465,000123 m
43 Chancery Court, Chancery Lane, Dublin 8Jun 2026€625,000123 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received21 February 2022
  2. Decision due14 April 2022
  3. Decision issued14 April 2022
  4. Grant issued27 May 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.