Planning Permission Ireland
GrantedExtensionDecided 19 August 2019

52, Shrewsbury Park, Dublin 4, D04 Y3F8

Construction of a rear extension, attic conversion with a dormer window, and relocation of the front door.

3340/19 · Dublin City Council · Lodged 25 June 2019

Reference
3340/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
25 June 2019

Summary

AI-generated

The proposed development includes a 14.2 sq.m rear extension and a 30 sq.m attic conversion with a rear dormer window. It also involves a new side window at attic level, relocating the front door, and associated internal and external alterations.

Extensionextensionattic conversiondormer
Floor area
44 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development consists of the construction of a14.2m2 extension to the rear of the existing property, a 30m2 attic conversion including a dormer window to the rear of the existing pitched roof, a new window to the side elevation at attic level, the relocation of the front door to the front elevation with associated alterations to the existing front and side elevations, and associated internal alterations in relation to the above.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
54 Shrewsbury Park, Ballsbridge, Dublin 4Jan 2025€1,100,00012 m
48 Shrewsbury Park, Ballsbridge, Dublin 4Feb 2026€1,100,00026 m
108 Shrewsbury Park, Ballsbridge, Dublin 4Aug 2025€695,00043 m
99 Shrewsbury Park, Ballsbridge, Dublin 4Jun 2026€850,00043 m
63 Shrewsbury Park, Dublin 4, DublinJan 2025€810,00056 m
43 Shrewsbury Park, Ballsbridge, DublinApr 2025€1,110,00062 m
68 Shrewsbury Park, Ballsbridge, Dublin 4Oct 2025€900,00064 m
81 Shrewsbury Park, Ballsbridge, Dublin 4May 2026€440,00092 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 June 2019
  2. Decision due19 August 2019
  3. Decision issued19 August 2019
  4. Grant issued25 September 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.