Planning Permission Ireland
WithdrawnAlterationsDecided 26 July 2019

Rose Cottage, Ordnance Survey Road, Phoenix Park, Dublin 15

Restoration and repairs to a two-storey protected cottage in Phoenix Park, including roof, window, and porch modifications.

3345/19 · Dublin City Council · Lodged 25 June 2019

Reference
3345/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
25 June 2019

Summary

AI-generated

The Commissioners of Public Works seek a 10-year planning permission for restoration and repairs to Rose Cottage, a protected structure. Works include replacing modern rooflights, slates, and rainwater goods with conservation-grade materials, replacing modern windows with timber sash windows, and reinstating decorative timber features.

Alterationsheritagerestorationpark
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: the commissioners of public works in ireland intend to apply for permission for development (10 year planning permission) at rose cottage, ordnance survey road, phoenix park, dublin 15, d15 ca4t (protected structure). The development will consist of restoration and repairs to existing 2 storey cottage and external w. C, comprising repairs to the existing structure and fabric and the following alterations and modifications
  • Remove modern front/south elevation dormer window and replace with a conservation rooflight
  • Replace 2 no. Existing modern rooflights in west elevation with conservation rooflights
  • Replace existing modern fibre cement roof slates and ridges with natural stone roof slates and clay ridge tiles and re-instatement of small extended sections of veranda roof either side of the front porch gable. Reinstate a decorative perforated painted timber barge panel to front porch
  • Replace modern pvc rainwater goods with metal rainwater goods
  • Replace 6 no. Existing ground floor modern windows and concrete cills with 5 no. Timber vertical sliding sash windows and 1 no. Casement window, all with stone cills
  • Replace modern timber front porch door and sidelights with slimline steel doubled door and sidelights
  • Replace modern timber inner front door and sidelights with timber double door and sidelights
  • Relocating kitchen to rear western dining room
  • Remove modern timber floor on battens in kitchen
  • Replace all modern cementitious external wall renders with lime render and remove modern cover slips to timber framing on sides of front porch
  • Replace modern door and architrave to bottom of stairs with sheeted door
  • Replace all modern flush panel doors with sheeted timber doors
  • Remove 4 no. Modern reconstitute stone tile fireplace surrounds and hearths including back boiler to kitchen to ground floor, re-instating brick arched range opening and installation of 3 no. Modern appropriate fireplace surrounds
  • Modifications to first floor layout, to include a new service room, converting rear inner bedroom to ensuite bathroom and timber sheeting to modern existing and new wall partitions to first floor
  • Removal of glazed modern screen to upper part of original partition at side of stairs at first floor level
  • Remove modern oil-fired boiler, housing, flue and pvc oil storage tank
  • To permit short term holiday letting
  • Demolition of 4 no. Modern timber ruinous out-buildings (a garage and 3 no. Sheds, c43sqm), and construction of a single storey garden shed (c 5sqm)19) installation of new plumbing, heating and electrical services and general repairs
  • All associated siteworks

Land-use zoning

What this land is zoned for

Z9: Amenity/Open Space Lands/Green NetworkOS
To preserve, provide and improve recreational amenity, open space and ecosystem services.

National zoning type: Mixed/general 'green'/recreation/conservation, other

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received25 June 2019
  2. Decision due19 August 2019
  3. Decision issued26 July 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.