A site of approx. 0.1024ha accessed from Shea's Lane and to the rear of No. 27, 28 & 29 Manor Street
Construction of a new three and part four-storey apartment development with 20 units.
3352/20/XA · Dublin City Council · Lodged 20 November 2025
- Reference
- 3352/20/XA
- Authority
- Dublin City Council
- Register status
- Decided
- Received
- 20 November 2025
Summary
AI-generatedThis application seeks an extension of duration for a development behind protected structures on Manor Street. The project consists of a new 3 and part 4-storey building containing 20 apartments, bicycle spaces, and associated site works.
- Residential units
- 20
- Storeys
- 4
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Ext. Of duration: protected structure: permission for development at this a site of approx. 0.1024ha accessed from shea's lane and to the rear of no. 27, 28 & 29 manor street, (all protected structures), dublin
- The development will consist of construction of a new 3 and part 4 storey apartment development consisting of 20 no. Apartments (7 no. 1 beds, 10 no. 2 beds, 2 no. 3 beds and 1 no. Studio units). Each residential unit has associated private open space in the form of a balcony or terrace and a communal open space. A total of 30 no. Bicycle spaces are proposed and 1 no. Set down car space. A single storey structure is proposed for a waste management and bicycle storage area along with associated bike shelter structures. The development shall be accessed from shea's lane. The associated site and infrastructural works include provision for water services, foul and surface water drainage and connections, attenuation proposals; permeable paving; all landscaping works; boundary treatments; shared surface footpath and roadway; and electrical services
Key dates
Timeline
- Application received20 November 2025
- Decision due23 January 2026
- Decision issued23 January 2026
- Permission expiry13 April 2030
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- RefusedNew dwelling
PROTECTED STRUCTURE: Planning permission for the following at this site at rear of no. 35 Manor Street, off…
Rear 35, Manor Street, Off O'Shea's Lane, Dublin 7
4467/19Dublin CityLodged 15 Nov 2019
- RefusedApartments
Planning Permission for development on a site of c 0.2765ha at Shelbourne House, Shelbourne Road, Dublin 4,…
Shelbourne House, Shelbourne Road, Dublin 4
2758/18Dublin CityLodged 17 Apr 2018
- InvalidApartments
PROTECTED STRUCTURE: Permission for development at lands at 3 Henrietta Lane, Dublin — The lands are situated…
Lands to the rear of No. 3 Henrietta Lane, Dublin 1
3371/20Dublin CityLodged 11 Sept 2020
- GrantedApartments
Permission for a residential development at a site of 0.0543 ha (c. 543 sq m) at Nos. 29-31 The Coombe,…
Nos. 29-31 The Coombe, Dublin 8, (Eircodes D08 A025 and D08 VE20)
4298/19Dublin CityLodged 24 Oct 2019
- GrantedChange of use
PROTECTED STRUCTURE: PERMISSION: For the change of use of existing 2 & 3 storey (over basement) former school…
12, Manor Street, Dublin 7, D07TH59
4026/23Dublin CityLodged 26 Jun 2023
- InvalidApartments
PROTECTED STRUCTURE: permission for development at this site, fronting Stable Lane, Dublin 7 consisting of…
31 Dominick Street Upper, Dublin 7 , fronting Stable Lane.
3418/23Dublin CityLodged 22 Mar 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.