Planning Permission Ireland
GrantedExtensionDecided 9 May 2023

6, Bayview Pembroke Street, Dublin 4, D04WP590

Renovation and extension of an unoccupied house, including a new two-storey rear extension and an attic conversion with a dormer window.

3382/23 · Dublin City Council · Lodged 15 March 2023

Reference
3382/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
15 March 2023

Summary

AI-generated

The project involves renovating an unoccupied residence, starting with the demolition of a single-storey rear return. It includes internal alterations, a new two-storey rear extension, a single-storey utility room, and converting the attic into a bedroom with a rear dormer window.

Extensionrenovationextensionattic conversiondemolition
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission: for renovations and extensions to an unoccupied residence. The works will consist of demolition of an existing single storey flat roofed rear return; internal renovations and alterations within the main area of the original house to form a hall, living room and wc under a new stairs on the ground floor, bedroom 1 with en-suite bathroom on the first floor; a new second floor consisting of bedroom 3 with a rear dormer window within the attic space. A new two storey rear extension to consist of kitchen /dining area on ground floor and bedrom 2 with en-suite bathroom on first floor. A new single storey utility room to the rear leading to a patio area.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 4 August 2023. A completion certificate was lodged on 29 August 2024.

Notified floor area: 128.5

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
1 Seaview, Irishtown, Dublin 4Jan 2026€955,00050 m
10 Herbert Place, Irishtown, Dublin 4Aug 2025€637,00053 m
37 Bath St, Irishtown, Dublin 4May 2026€500,00057 m
32 Pembroke St, Irishtown, Dublin 4Jul 2025€523,00068 m
84 Irishtown Rd, Irishtown, Dublin 4Oct 2025€700,00077 m
4 Chapel Ave, Irishtown, Dublin 4Sept 2025€600,000105 m
Apartment 111 Shore Club, Beach Road, Dublin 4price excludes VATJan 2026€486,239114 m
Apartment 105 Shore Club, Beach Road, Dublin 4price excludes VATFeb 2026€486,239114 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 March 2023
  2. Decision due9 May 2023
  3. Decision issued9 May 2023
  4. Permission expiry30 July 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.