Planning Permission Ireland
GrantedExtensionDecided 6 November 2020

18, Merlyn Park, Ballsbridge, Dublin 4

Demolition of a conservatory and construction of a ground-floor extension, attic conversion, and solar panels.

3383/20 · Dublin City Council · Lodged 14 September 2020

Reference
3383/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
14 September 2020

Summary

AI-generated

The development involves demolishing the existing conservatory and rear return to build a ground-floor side and rear extension. It also includes an attic conversion with a rear dormer window, widening the front gates, and installing solar panels on the front roof.

Extensionextensionattic conversionsolar

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: (i) the demolition of the existing conservatory and rear return at ground level and chimney to rear roof, (ii) a ground floor extension to the side and rear with flat roof, clerestory windows, (iii) first floor rear windows to be modified, (iv) attic conversion to bedroom and ensuite with dormer window to rear, (v) widening the front vehicular gates, (vi) provision of solar panels to front pitch of main roof, (vii) associated site and drainage works on a site measuring 701sq. M.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 15 February 2023. A completion certificate was lodged on 6 December 2023.

Notified floor area: 253

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
16 Merlyn Rd, Ballsbridge, Dublin 4Jan 2026€1,500,00064 m
51 St Johns Park Ave, Sandymount, Dublin 4Feb 2025€1,141,52277 m
46 St Johns, Sandymount, Dublin 4Feb 2025€925,00080 m
5 Merlyn Rd, Ballsbridge, Dublin 4Jan 2026€1,485,000123 m
Merlyn Park Lodge, Merlyn Park, BallsbridgeNov 2025€1,100,000133 m
40 Merlyn Rd, Ballsbridge, Dublin 4Feb 2026€1,500,000163 m
Apt 19, 143 Merrio Road, Ballsbridgeprice excludes VATMay 2025€674,008175 m
Apartment 39, 143 Merrion Road, Ballsbridgeprice excludes VATMay 2025€766,520175 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received14 September 2020
  2. Decision due6 November 2020
  3. Decision issued6 November 2020
  4. Grant issued22 December 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.