Planning Permission Ireland
RefusedRetentionDecided 2 September 2019

Osteria Lucio, The Malting Tower, Grand Canal Quay, Clanwilliam Terrace, Dublin 2

Retention of an outdoor seating enclosure for Osteria Lucio restaurant near a protected railway bridge.

3447/19 · Dublin City Council · Lodged 9 July 2019

Reference
3447/19
Authority
Dublin City Council
Register status
Appealed
Type
Retention Permission
Received
9 July 2019

Summary

AI-generated

Retention permission is sought for a 2-year period for a 23.2 sqm outdoor seating area structure. The structure comprises an aluminium and glass enclosure with a retractable roof, located near the protected Grand Canal Quay Railway Bridge.

Retentionrestaurantretentionprotected structure
Floor area
23 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure & retention: retention permission for development at "osteria lucio", the malting tower, grand canal quay, clanwiliam terrace, dublin
  • The property fronts onto clanwilliam terrace to the west and is south of grand canal quay railway bridge which is a protected structure (rps ref: 883/3276). The development consists of the following: retention (for 2 years) of outdoor seating area structure (c. 23.2sq. M) comprising aluminium and glass enclosure with retractable roof (c. 2.9 metres height, c. 1.74 metres width and c. 11.1 metres length). A small area of the site falls within the north lotts and canal dock strategic development zone planning scheme area, however the majority of the site is outside of the sdz planning scheme area. The specific development, the subject of this retention application is located outside the sdz planning scheme area

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
81 The Dock Mill, Barrow Street, Grand Canal DockSept 2025€505,000155 m
17 Dock Mill, Barrow St, Dublin 4Nov 2025€381,250155 m
Apt 4, The Dock Mill, Barrow St Dublin 4Sept 2025€385,000155 m
75 Dock Mill, Barrow St, Dublin 4Feb 2025€470,000155 m
61 Dockmill, Barrow St, Dublin 4May 2025€560,000155 m
16 The Dock Mill, Barrow St, Dublin 4Feb 2026€390,000155 m
12 Dock Mill Apts, Barrow St, Dublin 4Jun 2025€672,000155 m
54 Dock Mill, Barrow St, Dublin 4Mar 2026€500,000155 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 July 2019
  2. Decision due2 September 2019
  3. Decision issued2 September 2019
  4. Grant issued21 January 2020
  5. Appeal submitted12 September 2019
  6. Appeal decided21 January 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.