Planning Permission Ireland
GrantedExtensionDecided 20 July 2023

35 Ellesmere Avenue, North Circular Road, Cabra East, Dublin 7, D07 F5P7

Conservation works, a single-storey side and rear extension, and demolition of an asbestos shed at a protected structure.

3468/23 · Dublin City Council · Lodged 29 March 2023

Reference
3468/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
29 March 2023

Summary

AI-generated

The development at this protected structure involves extensive conservation and structural repairs, including underpinning and floor levelling. It also includes the demolition of an asbestos shed, the construction of a single-storey side and rear extension, and a new garden shed.

Extensionconservationprotected structureextension

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure (rps. No. 8836) : the development will consist of the demotion & removal of an existing asbestos shed, there is substantial settlement and cracking to dwelling, conservation works will include new point loading, underpinning, levelling floors & crack repairs which involves local partial demolition to these areas, new internal breathable insulation to all external walls, thermal upgrade works to internal timber floors & refurbishment of existing floors, restoration of existing timber casement windows & doors, repair works to existing tiled roof and chimneys and updated new mechanical and electrical systems. The proposed single-storey side & rear extension comprising of kitchen, dining and ground floor wc. External works include proposed new garden shed for refuse & bike storage, removal of existing cracked concrete paving for new permeable paving, maintenance to case iron fence & gate, clearance of foliage overgrowth and sundry other minor works.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 8 July 2024.

Notified floor area: 120.85

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
44 Glenbeigh Rd, Old Cabra Rd, Dublin 7Mar 2026€572,000109 m
83 Glenbeigh Rd, Dublin 7, DublinJan 2025€775,000122 m
36 Glenbeigh Rd, Cabra, Dublin 7Jan 2025€651,000126 m
28 Glenbeigh Rd, Blackhorse Ave, Dublin 7Jan 2026€696,000146 m
1-68 Blackhorse Place, Blackhorse Avenueprice excludes VATMar 2026€29,128,440155 m
68 Ellesmere Ave, Nth Circular Rd, Dublin 7Feb 2026€690,000163 m
43 Old Cabra Rd, Dublin 7, DublinFeb 2025€805,000167 m
68 Old Cabra Rd, Dublin 7, DublinNov 2025€960,000170 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 March 2023
  2. Decision due20 July 2023
  3. Decision issued20 July 2023
  4. Permission expiry14 October 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.