GrantedApartmentsDecided 9 June 2022

14A Poplar Row, North Strand, Dublin 3.

Demolition of a commercial garage to build a six-storey, 16-unit build-to-rent apartment building.

3476/21 · Dublin City Council · Lodged 9 September 2021

Reference
3476/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
9 September 2021
Residential units
16

Summary

AI-generated

The development involves demolishing an existing commercial garage to construct a six-storey build-to-rent apartment block. The scheme will contain 10 one-bedroom and 6 studio apartments, featuring balconies, communal terraces, bicycle parking, and an ESB substation.

Apartmentsdemolitionbuild to rentapartments
Storeys
6

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for the demolition of an existing commercial building, formerly used as a car garage and the development of a 'build to rent' residential apartment development, intended for use as a long-tern rental housing scheme comprising of a six-storey building to accommodate a total of 10 no. X 1 bedroom and 6 no. X studio apartments; with balconies at each level from first to sixth floor levels and communal open terraces (2 no. ) at ground floor level on the rear (north) elevation and fifth floor level to the front (south) and an esb substation/switch room at ground floor level; bicycle lock-up parking facilities with 32 no. Spaces; disable car parking space, a secure bin storage facility and associated site development works. Primary access to the development would be from poplar row.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 8 October 2024.

Notified floor area: 1,058.5

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
11a Cadogan Road, Fairview, Dublin 3Mar 2026€530,00049 m
11 Cadogan Road, Dublin 3, D03 Kr63Dec 2025€410,00067 m
15 Cadogan Rd, Fairview, DublinDec 2025€1,990,00073 m
1 Cadogan Rd, Fairview, Dublin 3Mar 2025€445,00077 m
33 Cadogan Rd, Fairview, Dublin 3May 2026€565,00092 m
2 Cadogan Rd, Fairview, Dublin 3Apr 2026€455,00099 m
30 Cadogan Rd, Fairview, Dublin 3Apr 2026€610,00099 m
9 Annesley Bridge Rd, Fairview, Dublin 3Jul 2025€475,000110 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 September 2021
  2. Further information requested1 April 2022
  3. Further information received13 May 2022
  4. Decision due9 June 2022
  5. Decision issued9 June 2022
  6. Grant issued25 July 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.