Planning Permission Ireland
GrantedExtensionDecided 7 October 2024

No. 1 Strand Terrace, Milltown, Dublin 6, D06 F6K1

Extension and remodelling of a house, including two first-floor dormers and a front bay extension.

3508/24 · Dublin City Council · Lodged 9 April 2024

Reference
3508/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
9 April 2024

Summary

AI-generated

The project involves the partial demolition of the front roof and elevation to construct two metal-clad first-floor dormers, adding a bedroom and extending the master bedroom. It also includes a new single-storey front bay window, new steps, and interior remodelling.

Extensionextensiondormerremodelling

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

For an extension to the existing single dwelling house. The development will consist/consists of: - partial demolition of the front tiled roof and front elevation to accomodate the proposed works . – construction of 2 metal clad first floor dormers providing an additional 1st floor bedroom, extended area to the master bedroom, and extending over the proposed new stair incorporating a rooflight. –construction of a single storey bay to the front of the house increasing the floor area of the ground floor living room. – demolition of existing access steps, front patio including raised area and railings, and construction of new steps, railings etc – interior remodelling – all associated external works, services, drainage, and landscaping works required to be undertaken in conjunction with this application.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 14 March 2025.

Notified floor area: 20

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
9 Milltown Court, Milltown Hill, Milltown Dublin 6Nov 2025€650,00026 m
10 Milltown Court, Milltown Hill, MilltownApr 2026€663,30030 m
7 Strand Terrace, Milltown, Dublin 6Sept 2025€476,00041 m
Apartment No. 9, Milltown Hill, MilltownAug 2025€560,00063 m
Apt 23 Shanagarry, Milltown Road, MilltownFeb 2025€627,50066 m
Apt 32 Dodderbank, Milltown, Dublin 14Jul 2025€650,000140 m
14 Dodderbank, Milltown, Dublin 14Apr 2025€480,000140 m
18 Dodderbank Apts, Milltown, Dublin 14Mar 2026€580,000140 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 April 2024
  2. Decision due7 October 2024
  3. Decision issued7 October 2024
  4. Permission expiry16 January 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.