Planning Permission Ireland
GrantedExtensionDecided 12 September 2019

9 Prince of Wales Terrace, Ballsbridge, Dublin D04XW65

Demolition of rear extensions and construction of a new three-storey rear extension to a protected house.

3547/19 · Dublin City Council · Lodged 19 July 2019

Reference
3547/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
19 July 2019

Summary

AI-generated

The project involves the demolition of existing single-storey, first, and second-floor rear extensions. A new three-storey extension will be constructed to the rear of the existing two-storey terraced house, alongside internal upgrades and repairs to the front brickwork of this protected structure.

Extensionprotected structureextensiondemolition
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: permission is sought for demolition of single storey extension, 1st and 2nd floor rear extensions. Provision of 3 storey extension comprising of ground floor and 2 storey over extensions to rear of existing 2 storey terraced house, provision of en-suite shower rooms within existing bedrooms at 1st and 2nd floor. Replacement of main roof finish with natural slates. Removal of rough cast render to front elevation and associated repairs to brickwork, replacement of 2nd floor front windows & associated upgrading and ancillary works at 9 prince of wales terrace, ballsbridge, dublin d04xw65, no 9 is recorded as a protected structure.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 26 November 2019.

Notified floor area: 194.6

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
10 Prince Of Wales Terrace, Ballsbridge, Dublin 4Nov 2025€1,455,00012 m
61 Shrewsbury, Ballsbridge, Dublin 4Dec 2025€1,000,00034 m
13 Shrewsbury Square, Sandymount Avenue, Dublin 4Aug 2025€802,50042 m
22 Shrewsbury Sq, Sandymount Ave, BallsbridgeApr 2025€810,00042 m
Apt 5 Shrewsbury Square, Ballsbridge, Dublin 4Aug 2025€795,00042 m
16 Shrewsbury Sq, Sandymount Ave, Dublin 4Feb 2025€865,00042 m
24 Shrewsbury Sq, Sandymount Ave, Ballsbridge Dublin 4Oct 2025€845,00042 m
57 Shrewsbury, Ballsbridge, Dublin 4Feb 2025€825,00045 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 July 2019
  2. Decision due12 September 2019
  3. Decision issued12 September 2019
  4. Grant issued22 October 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.