Planning Permission Ireland
GrantedChange of useDecided 7 December 2020

Rear of Long Mile Works, Long Mile Road, Dublin 12

Change of use of part of the first floor from a data hall to office space with new windows and fire exit modifications.

3577/20 · Dublin City Council · Lodged 16 October 2020

Reference
3577/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
16 October 2020

Summary

AI-generated

The development consists of changing the use of an 884.6 square metre portion of the first floor from a data hall to office space. It also includes installing three new large windows on the North and West elevations, and making amendments to several ground-floor fire exit doors.

Change of useofficedata centre
Floor area
885 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The development will consist of
  • ) change of use of part of the first floor from data hall to office space (884.6m2)
  • ) 3 no. Large new windows on both the north & west elevations at first floor level to match existing
  • ) amendments to 3 no. Existing fire exit doors on the north & south elevations at ground floor level
  • ) 2 no. New fire exit doors on the north & east elevations at ground floor level
  • ) all associated site works. Note no additional floor area is being created as part of this application

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 24 January 2022. A completion certificate was lodged on 25 October 2024.

Notified floor area: 6,270

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
55 Walkinstown Parade, Dublin 12, DublinOct 2025€375,000152 m
40 Walkinstown Parade, Walkinstown, Dublin 10Jul 2025€445,000238 m
143 Walkinstown Dr, Dublin 12, Dublinnot full market priceMay 2026€280,000310 m
139 Walkinstown Dr, Dublin 12, DublinMar 2026€460,000324 m
100 Walkinstown Dr, Walkinstown, Dublin 12May 2026€475,000334 m
127 Walkinstown Dr, Walkinstown, Dublin 12Jun 2026€480,000344 m
Apt 2c, Lansdowne Valley, Slievebloom Rd Dublin 12Mar 2025€262,000348 m
90 Walkinstown Dr, Walkinstown, Dublin 12Mar 2026€570,000348 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 October 2020
  2. Decision due10 December 2020
  3. Decision issued7 December 2020
  4. Grant issued2 February 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.