Planning Permission Ireland
RefusedApartmentsDecided 19 September 2018

Clare Village, Malahide Road, Ayrfield, Dublin 17

Conversion and extension of a vacant crèche building into six residential units.

3583/18 · Dublin City Council · Lodged 26 July 2018

Reference
3583/18
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
26 July 2018

Summary

AI-generated

The project involves changing the use of a vacant crèche building to six residential units, comprising four two-bedroom and two four-bedroom homes. Works include adding an extra storey to the existing two-storey building, installing a new access walkway, and adding balconies and patios.

Apartmentschange of useconversionextension
Residential units
6
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the alterations and change of use of an existing vacant building from permitted crèche to 6 no. Residential units with all associated site works, including an additional storey to the existing 2-storey building. The alterations will include provision of a new lightweight access walkway at ground floor level, alterations to the elevations of the building including construction of an additional floor at first floor level, provision of balconies and subdivision of existing external patio space. The new units will be over 3 levels lower ground, ground and first floor level comprising of 4 no. 2-bed units and 2 no. 4-bed units, all with patio areas at lower ground floor level.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 31 Doolin House, Clare Village Clare, Hall Malahide Rd Dublin 17Aug 2025€290,00033 m
41 Doolin House, Clare Village, Clarehal Mahahide RdNov 2025€340,00033 m
Apt 22 Kilkee House, Clare Village, Clare Hall Dublin 17Mar 2026€238,00037 m
44 Kilkee House, Clare Village, Malahide RoadJun 2026€289,00041 m
39 Ennis House, Clare Village, Clarehall Malahide RdJul 2025€280,00042 m
27 Kilkee House, Clare Village, Clare Hall Dublin 17Jul 2025€344,00051 m
36 Ennis House, Clare Village, Malahide RdMay 2025€320,00051 m
Apt 25, Doolin House, Clare Village Dublin 17Apr 2025€265,00055 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 July 2018
  2. Decision due19 September 2018
  3. Decision issued19 September 2018
  4. Appeal submitted18 October 2018
  5. Appeal decided3 January 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.