Planning Permission Ireland
GrantedApartmentsDecided 19 December 2023

75-78, Cork Street, Dublin 8

Modifications to a permitted development to provide 54 Build to Rent apartments and a retail unit on Cork Street.

3619/18/X1 · Dublin City Council · Lodged 8 November 2023

Reference
3619/18/X1
Authority
Dublin City Council
Register status
Decided
Received
8 November 2023

Summary

AI-generated

This application seeks an extension of duration for modifications to a permitted mixed-use scheme. The changes propose reconfiguring the development to provide 54 Build to Rent units and a 93 sqm retail/office unit in a part four, part six, and part seven-storey building.

Apartmentsbuild to rentapartmentsretail
Residential units
54
Storeys
7
Floor area
93 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Ext. Of duration: planning permission for modifications to the mixed use development permitted under reg. Ref. : 3086/17 at 75-78 cork street, dublin
  • The application site comprises of c. 0.16 hectares and is bound by cork street to the south east, no. 79 cork street to the east, no. 74 cork street to the south west and our lady's road and rosary road to the north west. The proposed modifications to the permitted scheme include the following: - reconfiguration and alterations of approved
  • No. Unit residential and 213 sq. M retail / office scheme to provide for a total of 54 no. Build to rent units, associated communal space and a 93 sq. M retail / office unit. The proposed build to rent units will comprise of 10 no. Studio units, 26 no. 1 bed units and 18 no. 2 bed units in a part four, part six and part seven storey building; - modifications include the provision of an additional storey (proposed as sixth floor level) to comprise of 1 no. 1 bedroom apartment and 1 no. 2 bed apartment, a 120 sq. M communal gym, a communal terrace and a green roof; - modifications to include a concierge and communal facility measuring 112 sq. M at ground floor level and associated reduction of the permitted gfa of the ground floor retail / office unit from 213 sq. M to 93 sq. M; - modifications to the permitted basement level, including a reduction of the gfa from 504 sq. M to 215 sq. M, including 68.4 sq. M of communal storage space and 92.4 sq. M plant area and associated reduction of car parking provision from 27 no. Spaces at basement and surface level to 5 no. Surface parking spaces; - modifications to cycle parking provision resulting in an increase from 36 no. To 72 no. Cycle parking spaces; - the proposed modifications include associated alterations to the elevations, the provision of an esb substation, alterations to the bin and bike stores and associated site development works; - the proposed modifications result in an increase in the total gross floor area of the mixed use development by 245 sq. M from 4,462 sq. M. (including the basement / undercroft car parking area) to 4,707 sq. M

Key dates

Timeline

  1. Application received8 November 2023
  2. Decision due11 January 2024
  3. Decision issued19 December 2023
  4. Permission expiry25 February 2027

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.