Planning Permission Ireland
InvalidAlterationsDecided 9 May 2023

35 Hazelbrook Drive, Terenure, Dublin 6w, D6W NV09

Amendments to a previously approved extension, including setbacks and window changes.

3622/23 · Dublin City Council · Lodged 24 April 2023

Reference
3622/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
24 April 2023

Summary

AI-generated

This application seeks modifications to a previously granted permission. Changes include setting back the first-floor rear extension from the boundary, reducing the side extension length, adding a new rear bathroom window, and narrowing the front vehicular entrance.

Alterationsamendmentextension

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of amendments and modifications of condition no. 3 and the overall permission was granted under planning ref. 5500/22 as follows: first floor rear extension to be set back by c. 1.0 m from the boundary with no 37 hazelbrook drive; new elevation treatment to the ground floor of the side elevation of the permitted extension; reduction in the permitted length of the side extension by c. 04m; new rear facing window within family bathroom at first floor level; relocation of the rooflight above the single storey rear extension; omission of the permitted first floor window serving the ensuite on the permitted rear extension; narrowing of the existing vehicular entrance to 3m to the front of the property with new entrance pier to match existing.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
25 Hazelbrook Dr, Terenure, Dublin 6wJun 2025€790,00042 m
26 Hazelbrook Dr, Terenure, Dublin 6wSept 2025€811,00065 m
13 Hazelbrook Drive, Terenure, Dublin 6wFeb 2025€765,00085 m
32 Corrib Rd, Terenure, Dublin 6wApr 2026€685,00086 m
21 Hazelbrook Rd, Terenure, Dublin 6wSept 2025€1,423,324125 m
44 Derravaragh Rd, Terenure, Dublin 6wOct 2025€655,000147 m
324 Kimmage Rd Lower, Apt 1, KimmageApr 2026€500,000150 m
334 Kimmage Rd Lower, Dublin 6w, DublinJul 2025€560,000155 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received24 April 2023
  2. Decision due16 June 2023
  3. Decision issued9 May 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.