Planning Permission Ireland
GrantedExtensionDecided 4 July 2024

51 Glasnevin Park, Dublin 11, D11 A2K5

Demolition of a side garage and store to build a two-storey side extension, single-storey rear extension, and loft conversion.

3668/24 · Dublin City Council · Lodged 10 May 2024

Reference
3668/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
10 May 2024

Summary

AI-generated

The development comprises the demolition of an external store, side garage, part of the kitchen, and a chimney. It proposes constructing a two-storey side extension, a single-storey rear extension, and a non-habitable loft conversion with a rear box dormer.

Extensiondemolitionloft conversiondormer
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development which is a semi-detached dwelling. The proposed development comprises demolition of the following; single storey external store, single storey garage and part kitchen, and two storey chimney all to side (north west) of existing dwelling, and construction of the following; two storey extension to side (north west) of existing dwelling with hipped roof and 2 no velux rooflights; single storey extension to rear (south west) of existing dwelling with flat roof and rooflights; non habitable loft conversion with box dormer to rear (south west) elevation, new windows to side (north west) elevation at ground floor level and first floor level; internal alterations and associated elevation changes, landscaping, drainage including rainwater planters and ancillary site works.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 11 December 2024.

Notified floor area: 104

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
102 Hillcrest Park, Glasnevin, Dublin 11Jul 2025€600,00038 m
84 Hillcrest Park, Dublin 11, DublinDec 2025€575,00080 m
42 Hillcrest Park, Glasnevin, Dublin 11Oct 2025€500,000109 m
64 Glasnevin Park, Glasnevin, Dublin 11Aug 2025€665,000191 m
121 Glasnevin Ave, Dublin 11, DublinOct 2025€610,000209 m
86 St Pappin Rd, Wadelai Estate, Dublin 11Aug 2025€516,000210 m
99 Glasnevin Ave, Dublin 11, Dublinnot full market priceJan 2025€456,000216 m
74 Glasnevin Park, Dublin 11, DublinSept 2025€665,000225 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 May 2024
  2. Decision due4 July 2024
  3. Decision issued4 July 2024
  4. Permission expiry26 September 2029

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.