Planning Permission Ireland
GrantedAlterationsDecided 2 October 2018

Regina Coeli Hostel, Morning Star Avenue, Dublin 7, D07K525

Refurbishment of the Regina Coeli Hostel including demolition of a laundry room and construction of two-storey extensions.

3698/18 · Dublin City Council · Lodged 9 August 2018

Reference
3698/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
9 August 2018

Summary

AI-generated

The project involves the refurbishment of the hostel, including the removal of external steel fire stairs and the demolition of a 23 sqm laundry room. These will be replaced with two 2-storey extensions containing fire escape stairs, alongside extensive internal accessibility and fire safety upgrades.

Alterationshostelrefurbishmentextensiondemolition
Storeys
2
Floor area
23 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for refurbishment of building to include removal of existing external steel fire escape stairs and demolition of single storey laundry room 23m2 and replacement with 2 no. 2 storey extensions comprising 2 no. Fire escape stairs and fire exits. Internal alterations to internal layout to improve accessibility & fire safety, new internal lift serving all floors, new doorway and access ramp to the west, internal alterations at ground floor and first floor to create waiting room, meeting rooms, reception rooms, sacristy, stores, new kitchen layout, new office rooms, accessible wc's, tea stations, removal of existing stair case, new fire lobbies and associated works.

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
182 Richmond, Brunswick St, Dublin 7Jun 2025€320,00088 m
178 The Richmond, North Brunswick St, Dublin 7Jun 2026€316,00088 m
160 The Hardwicke, North Brunswick St, Smithfield Dublin 7Oct 2025€320,000138 m
161 The Hardwicke, North Brunswick Street, Dublin 7Jul 2025€357,000138 m
1 Whitworth Hall, North Brunswick St, Dublin 7Dec 2025€460,000153 m
45 The Hardwick, Morning Star Lane, Dublin 7May 2026€285,000154 m
15 Richmond Sq, Off North St, BrunswickSept 2025€326,000160 m
27 Richmond Sq, Morning Star Ave, North Brunswick St Dublin 7Dec 2025€330,000160 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received9 August 2018
  2. Decision due3 October 2018
  3. Decision issued2 October 2018
  4. Grant issued9 November 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.