Planning Permission Ireland
InvalidChange of useDecided 24 May 2024

1 Pearse Square, Dublin 2, D02PC61

Conversion of a three-storey protected structure from three residential units into a single family home.

3732/24 · Dublin City Council · Lodged 22 May 2024

Reference
3732/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 May 2024

Summary

AI-generated

The application seeks retention and permission for maintenance and structural repairs to a three-storey end-of-terrace house. The works include converting the property from three residential units back into a single domestic dwelling, alongside roof, window, and wall repairs.

Change of useprotected structurerenovationresidential
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: permission & retention:the development will consist of: retention permission for maintenance works carried out to date, including removal of internal render and plasterboard ceilings to facilitate structural repairs to walls and floors and part internal re-rendering and permission for change of use from three residential units to single domestic dwelling and completion works, including structural repairs to walls and floors, repointing of walls and chimneys, remedial works to roofs, new rear facing roof lights to main roof, replacement of windows and doors, internal re-rendering of walls, reinstatement of original layout generally, upgrading of services, and external re-rendering of front basement elevation. Number 1 pearse square is a three storey end of terrace house and is a protected structure hiah registry reference number 50020489.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 29 May 2025.

Notified floor area: 176.8

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
133 Pearse Street, Dublin 2Jun 2026€915,00085 m
6 Winter Gardens, Pearse Street, Dublin 2Mar 2025€395,00086 m
Apt 11 The Hazel, Wintergarden, Pearse St Dublin 2Dec 2025€429,00086 m
10 Clarence Place Great, Macken St, DublinJul 2025€610,00090 m
121 Winter Garden, Pearse St, Dublin 2Apr 2026€360,00091 m
117 Winter Garden, Pearse St, Dublin 2Apr 2025€310,00091 m
45 Winter Gardens, Pearse Street, Dublin 2Apr 2026€391,00095 m
32 A Macken St, Dublin 2, DublinNov 2025€405,000103 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 May 2024
  2. Decision due16 July 2024
  3. Decision issued24 May 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.