Planning Permission Ireland
GrantedExtensionDecided 25 November 2024

32, The Rise, Glasnevin, Dublin 9

Demolition of a garage and side passage roof, and construction of a part single, part two-storey rear extension and garden room.

3736/24 · Dublin City Council · Lodged 22 May 2024

Reference
3736/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 May 2024

Summary

AI-generated

The development involves the demolition of a side passage roof, a connected store building, a rear garage, and a chimney. It includes internal alterations and the construction of a part single-storey, part two-storey rear extension, a new side passage roof, and a garden room with rear lane access.

Extensiondemolitiongarden roomrear extension

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development at 32 the rise, glasnevin, dublin
  • The development will consist of demolition of a side passage roof and connected store building to rear of dwelling, demolition of garage to rear of site, demolition of chimney, alterations to the internal arrangement at ground and first floor of existing dwelling, construction of part single storey part two storey extension to the rear of the dwelling, construction of a new roof over side passage, construction of garden room to rear of site with pedestrian access to rear lane way and associated site works

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
20 The Rise, Glasnevin, Dublin 9Jun 2025€898,00054 m
11 The Rise, Griffith Ave, Dublin 9Jul 2025€805,000127 m
2a The Rise, Glasnevin, The Rise Dublin 11Aug 2025€795,000163 m
445 Griffith Avenue, Glasnevin, Dublin 9Jan 2025€1,100,000168 m
439 Griffith Ave, Glasnevin, Dublin 9Mar 2025€1,045,000176 m
57 Ballymun Road, Glasnevin, Dublin 9Nov 2025€397,400223 m
3 Towerview Grove, Glasnevin, Dublinprice excludes VATMay 2025€832,599256 m
5 Towerview Grove, Glasnevin, Dublin 11price excludes VATSept 2025€733,920256 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 May 2024
  2. Decision due25 November 2024
  3. Decision issued25 November 2024
  4. Permission expiry6 March 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.