Planning Permission Ireland
GrantedNew dwellingDecided 20 January 2021

Site to side of no 20 Ribh Road & 20 Ribh Road Artane, Dublin 5 D05 HW97

Construction of a new two-storey, one-bedroom house to the side of an existing house.

3750/20 · Dublin City Council · Lodged 17 November 2020

Reference
3750/20
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
17 November 2020

Summary

AI-generated

The development consists of building a new two-storey, one-bedroom dwelling in the side garden of an existing house. The project includes a single-storey flat roof extension with an open roof terrace, a new porch for the existing house, and two new vehicular entrances.

New dwellingnew dwellinginfillroof terrace
Residential unit
1
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of the proposed construction of a new two storey 1-bedroom dwelling to side of existing dwelling. A new single storey flat roof extension to side and front of new dwelling. Open roof terrace located above single storey extension. Proposed relocation of entrance door to existing dwelling and provision of new entrance porch to existing dwelling. Also 2 new vehicular entrances, driveways for two off street car spaces, new boundary walls, separation of front and rear gardens and all other ancillary site works included in the application.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 11 April 2022.

Notified floor area: 74.7

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
18 Mcauley Drive, Artane, Dublin 5Sept 2025€413,000112 m
81 Harmonstown Rd, Artane, Dublin 5not full market priceJun 2026€385,000121 m
41 Ribh Ave, Artane, Dublin 5Mar 2025€457,000133 m
69 Bothar Ribh, Artane, Dublin 5Jul 2025€488,000153 m
33 Harmonstown Rd, Artane, Dublin 5Feb 2025€445,000173 m
16 Brookwood Crescent, Artane, Dublin 5Jul 2025€650,000180 m
31 Mc Auley Drive, Artane, Dublin 5Jul 2025€427,000194 m
27 Mcauley Drive, Dublin 5Jul 2025€369,000230 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received17 November 2020
  2. Decision due20 January 2021
  3. Decision issued20 January 2021
  4. Grant issued3 March 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.