Planning Permission Ireland
GrantedExtensionDecided 6 July 2023

35, Windsor Road, Dublin 6, D06 H2N4

Extension and refurbishment of a protected structure, including solar panels and internal alterations.

3752/23 · Dublin City Council · Lodged 12 May 2023

Reference
3752/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
12 May 2023

Summary

AI-generated

The development consists of extending the existing single-storey rear extension and constructing a new raised flat roof with rooflights. It also includes installing solar panels on the inner pitched roofs, internal reconfiguration, and repointing the front brickwork.

Extensionheritagesolarextension

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: permission: the development will consist of: a) the proposed extension of the existing single storey rear extension, together with the removal of the existing flat roof with associated rooflights, and the construction of a proposed new raised flat roof with 2 no. Rooflights. B) the proposed solar panels to the existing inner pitched roofs. C) the removal of the existing pitched rooflight and its replacement with a new increased size rooflight. D) all internal reconfiguration and associated refurbishment works. E) the repointing of the existing brickwork with lime mortar to the front south elevation. F) all ancillary site, boundary and landscaping works.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 16 November 2023.

Notified floor area: 4

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
42 Ormond Rd, Rathmines, Dublin 6Dec 2025€90,00057 m
44 Ormond Rd South, Rathmines, Dublin 6May 2026€95,00061 m
20 Windsor Rd, Rathmines, Dublin 6Apr 2026€2,375,00072 m
76 Moyne Road, Ranelagh, Dublin 6Jul 2025€1,650,00075 m
20 Ormond Rd, Rathmines, Dublin 6Jul 2025€2,850,00085 m
44 Annesley Park, Ranelagh, Dublin 6Apr 2025€800,000103 m
8 Ormond Road South, Rathmines, Dublin 6Jun 2026€2,150,000133 m
1 Moyne Court, Ranelagh, Dublin 6Feb 2025€775,000140 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 May 2023
  2. Decision due6 July 2023
  3. Decision issued6 July 2023
  4. Permission expiry30 September 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.