Planning Permission Ireland
InvalidChange of useDecided 9 November 2021

118, Thomas Street, Dublin 8

Change of use and a two-storey roof extension to create residential units at a protected structure.

3797/21 · Dublin City Council · Lodged 3 November 2021

Reference
3797/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
3 November 2021

Summary

AI-generated

The project at a protected structure in an architectural conservation area involves converting the rear ground floor from a home brewers centre to a residential unit. It also includes building a two-storey roof extension to the rear to accommodate two additional residential units.

Change of useprotected structureconversionapartments
Residential units
3
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the building is located in an architectural conservation area. The proposed works include i) a change of use of the rear of the ground floor unit from home brewers centre to residential unit, and ii) a two storey extension on the roof of the existing ground floor to the rear comprising of a residential unit on each floor.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
33 Millers Hall, Thomas Street, Dublin 8Jan 2025€315,00046 m
Apt 4 St Catherines Church, Bridgefoot Street, Dublin 8Dec 2025€325,00079 m
Apt 9 St Catherines Church, Bridgefoot Street, Dublin 8Apr 2025€267,50079 m
Apt 14 St Catherines Church, Bridgefoot Street, Dublin 8May 2025€303,00079 m
Apt 7 St Catherines Church, Bridgefoot Street, Dublin 8Feb 2026€323,00079 m
Apt 5 St Catherines Church, Bridgefoot Street, Dublin 8May 2025€250,00079 m
Apt 10 St Catherines Church, Bridgefoot Street, Dublin 8Feb 2026€245,00079 m
Apt 15 St Catherines Church, Bridgefoot Street, Dublin 8May 2026€312,50079 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 November 2021
  2. Decision due6 January 2022
  3. Decision issued9 November 2021

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.