Planning Permission Ireland
RefusedAlterationsDecided 17 July 2023

Keavan's Port, 1-5 Camden Street Upper and 49-51 Camden Street Lower, Dublin 2

Construction of a 13.2m high acoustic barrier at a protected hotel property.

3816/23 · Dublin City Council · Lodged 23 May 2023

Reference
3816/23
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
23 May 2023

Summary

AI-generated

Permission is sought for development at Keavan's Port, which includes several protected structures. The project involves constructing a 13.2-metre-high acoustic barrier with a wood panelling finish to provide noise mitigation in the southern courtyard.

Alterationsprotected structurenoise barrierhotel

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: permission for development on lands at keavan's port, 1-5 camden street upper and 49-51 camden street lower, dublin
  • No’s 1, 2, 3, 4 and 5 camden street upper and no’s 50 and 51 camden street lower are protected structures. The development comprises the construction of an acoustic barrier (c. 13.2m in height, c. 8.1m in width) with rockpanel wood panelling rainscreen finish immediately adjoining the existing south courtyard boundary wall between the rear of no. 5 camden street upper and the hotel building to provide noise mitigation within the southern courtyard

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
9 Grantham Place, South Circular Rd, Dublin 8Dec 2025€600,00036 m
3 Grantham Place, Harrington St, Dublin 8Oct 2025€287,50043 m
3a Grantham Place, Harrington St, Dublin 8Oct 2025€287,50049 m
6 Harcourt Hall, Charlotte Way, Dublin 2Jan 2025€386,00070 m
25 Harcourt Hall, Charlotte Way, Dublin 2Apr 2025€470,00070 m
38 Synge St, Dublin 8, DublinNov 2025€1,720,00091 m
Apt 3, 61 Camden St, Dublin 2May 2025€480,000128 m
Apt 1, 61 Camden St, Dublin 2Jul 2025€460,000128 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 May 2023
  2. Decision due17 July 2023
  3. Decision issued17 July 2023
  4. Appeal submitted10 August 2023
  5. Appeal decided24 November 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.