GrantedInfrastructureDecided 29 January 2019

The existing ESB compond on South Lotts Road, Dublin 4

Construction of a new 38kv ESB substation building over basement on South Lotts Road.

3869/18 · Dublin City Council · Lodged 5 September 2018

Reference
3869/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
5 September 2018

Summary

AI-generated

The development consists of a new 38kv substation comprising a single-storey building of 470 sq.m over a 330 sq.m basement. The works will include underground cabling, drainage, and ancillary site works with access from South Lotts Road.

Infrastructuresubstationinfrastructureutility
Storey
1
Floor area
800 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of a new 38kv substation development comprising; (i) a single storey building (470sq. M floor area) over basement (330 sq. M floor area) with an overall height to apex of approx. 6 m; (ii) underground cabling and drainage; and (iii) ancillary site development works. Note the site will be accessed from the existing entrance to the esb compound on south lotts road. A secondary access to the site is available from the laneway running from south lotts road to sportsco, along the northern boundary of the site adjacent to shelbourne park apartments.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 24 May 2023.

Notified floor area: 795

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
53 Shelbourne Park, South Lotts Rd, Ringsend Dublin 4Apr 2026€450,000111 m
78 Shelbourne Park Apts, South Lotts Rd, Dublin 4Nov 2025€470,000111 m
51 Shelbourne Park Apts, South Lotts Rd, Dublin 4not full market priceOct 2025€420,000111 m
25 Shelbourne Park, Dublin 4, DublinJan 2026€510,000111 m
24 Shelbourne Park Apts, South Lotts Rd, Dublin 4Jul 2025€510,000111 m
Apt 43 Shelbourne Park, Dublin 4, DublinFeb 2025€536,000111 m
76 Shelbourne Park, South Lotts Rd, Dublin 4Mar 2025€530,000111 m
62 South Lotts Rd, Dublin 4, DublinDec 2025€490,000124 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 September 2018
  2. Further information requested30 October 2018
  3. Further information received2 January 2019
  4. Decision due29 January 2019
  5. Decision issued29 January 2019
  6. Grant issued7 March 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.