Planning Permission Ireland
RefusedAlterationsDecided 18 October 2019

765D / 765E South Circular Road, Dublin 8

Alterations to a previously approved development near protected structures on South Circular Road.

3904/19 · Dublin City Council · Lodged 2 September 2019

Reference
3904/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
2 September 2019

Summary

AI-generated

The development consists of changes to a previously approved scheme. It includes the provision of an enclosed bicycle storage unit with service connections, the removal of approved Sheffield bicycle stands, and alterations to the site layout plan.

Alterationsbicycleheritage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the development will consist of alterations to previously approved development under pl. Reg. Ref 3484/18. Pl. Reg. Ref. 3309/19 also applies. Particulars proposed consist of: (i) provision of an enclosed bicycle storage unit with connection to services. (ii) removal of approved sheffield bicycle stands to site. (iii) alterations to site layout plan. The proposed development is located on lands adjacent to protected structures.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 18 February 2019. A completion certificate was lodged on 15 March 2022.

Notified floor area: 48.1

5 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
225 Bellview, Islandbridge, Dublin 8Dec 2025€425,00021 m
243 Neptune House, Bellevue Apts, IslandbridgeJan 2025€420,00021 m
215 Bellevue, Islandbridge, DublinAug 2025€453,00021 m
220 Neptune House, Bellevue, Islandbridge Dublin 8Nov 2025€336,00021 m
Unit 106, Bellevue, IslandbridgeMay 2026€320,00025 m
Apt 143 Block F, Bellevue, Islandbridge Dublin 8Mar 2025€310,00053 m
166 Block D, Bellevue, IslandbridgeOct 2025€400,00073 m
Apartment 252, Fairbairn House, BellevueNov 2025€370,00078 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received2 September 2019
  2. Decision due25 October 2019
  3. Decision issued18 October 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.