Planning Permission Ireland
GrantedCommercialDecided 14 July 2022

5-6 Georges Dock, Dublin 1

Construction of a new single-storey shower block at Georges Dock following the removal of three parking spaces.

4022/22 · Dublin City Council · Lodged 20 May 2022

Reference
4022/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
20 May 2022

Summary

AI-generated

The development consists of removing three ground-floor car parking spaces to construct a standalone single-storey shower block. The facility will include male, female, and disabled shower rooms, a drying room, and an entrance canopy.

Commercialoffice amenityshower block
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for the development will consist of the removal of 3 car parking spaces at ground floor level and construction of a new stand alone single storey shower block accessed from the rear car park entrance to the building. The structure will contain 2 new male shower rooms, 2 female shower rooms and one disabled wc and shower room and a drying room. The entrance to the shower rooms will have an overhead canopy and planter box with integrated external lighting.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 10 October 2022.

Notified floor area: 66.1

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
198 Tuskar Rock, Custom House Harbour, I F S C Dublin 1Dec 2025€366,66652 m
Apt 19 Block A, Mayor St, Custom House SqMay 2025€395,00067 m
21 Malton House, Custom House Sq, Mayor St Lower Dublin 1Jun 2026€419,00067 m
11 Semple House, Lower Mayor St, Dublin 1Oct 2025€324,00090 m
17 Semple House, Custom House Sq, Mayor St Lower Dublin 1Aug 2025€311,89390 m
15 Semple House, Custom House Sq, Dublin 1May 2025€440,00090 m
279 Custom House Harbour, Ifsc, Dublin 1Apr 2026€405,00091 m
Apt 315, Argylle, Custom House Harbour Dublin 1Sept 2025€412,00091 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 May 2022
  2. Decision due14 July 2022
  3. Decision issued14 July 2022
  4. Grant issued29 August 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.