51, St. Jarlath Road, Cabra, Dublin 7, D07 R2P6.
First-floor rear extension and roof alterations to a house in Cabra.
4089/21 · Dublin City Council · Lodged 15 December 2021
- Reference
- 4089/21
- Authority
- Dublin City Council
- Register status
- Decided
- Type
- Permission
- Received
- 15 December 2021
Summary
AI-generatedPlanning permission is sought for alterations to an existing ground-floor rear extension roof. The project also includes building a new first-floor rear extension directly over the existing ground-floor extension.
- Storeys
- 2
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Planning permission sought for alterations to existing tiled roof to ground floor rear extension with rooflights, new first floor rear extension over existing rear extension with tiled roof with rooflights, new rooflight in existing rear tiled roof, internal alterations and associate site works.
Land-use zoning
What this land is zoned for
“To protect, provide and improve residential amenities.”
National zoning type: Existing residential
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 53 Saint Jarlath Road, Cabra, Dublin 7 | May 2026 | €415,000 | 6 m |
| 39 St Jarlath Rd, Cabra, Dublin | Jan 2026 | €440,000 | 34 m |
| 37 St Jarlath Rd, Cabra, Dublin 7 | Feb 2025 | €340,000 | 35 m |
| 2 St Eithne Rd, Cabra, Dublin 7 | Feb 2025 | €465,000 | 49 m |
| 51 Fassaugh Rd, Cabra, Dublin 7 | Apr 2025 | €520,000 | 83 m |
| 76 St Attracta Rd, Cabra, Dublin 7 | Dec 2025 | €416,000 | 91 m |
| 63 Fassaugh Rd, Cabra, Dublin 7 | Apr 2026 | €602,500 | 97 m |
| 6 Devlin Road, Cabra, Dublin 7 | Jul 2025 | €495,000 | 100 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received15 December 2021
- Decision due17 February 2022
- Decision issued23 December 2021
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Alterations to existing tiled roof to ground floor rear extension with rooflights, new first floor rear…
51, Saint Jarlath Road, Dublin 7, D07 R3P6
3112/22Dublin CityLodged 21 Jan 2022Extension
- GrantedAt this site
The development will consist of a new two storey, two bedroom dwelling to the side garden of the existing…
55, Saint Jarlath Road, Cabra, Dublin 7 D07 R3H3
WEB1641/23Dublin CityLodged 27 Jul 2023New dwelling
- InvalidAt this site
The development will consist of a new two storey, two bedroom dwelling to the side garden of the existing…
55, Saint Jarlath Road, Cabra, Dublin 7
WEB1505/23Dublin CityLodged 15 Jun 2023New dwelling
- Granted40 m away
Planning Permission sought for proposed first floor extension over existing single extension at side
No. 67 St. Jarlath Road, Cabra, Dublin 7.
2262/20Dublin CityLodged 13 Feb 2020Extension
- Invalid40 m away
The development will consist of the demolition of the existing chimney, the construction of a first-floor…
58 Faussagh Road, Cabra East, Dublin 7, D07 N9E4
WEB2239/26Dublin CityLodged 22 May 2026Extension
- Awaiting decision40 m away
The development will consist of the demolition of the existing chimney, the construction of a first-floor…
58 Faussagh Road, Cabra East, Dublin 7
WEB2298/26Dublin CityLodged 28 May 2026Extension
- Granted50 m away
The development consists for the demolition of a single storey extension to the rear and for the construction…
70, Fassaugh Road, Cabra, Dublin 7
WEB1090/18Dublin CityLodged 27 Feb 2018Extension
- Granted50 m away
First floor extension to the rear and side. Single-story extension to the front and side for extended living.…
56, Faussagh Road, Dublin 7
WEB1912/23Dublin CityLodged 23 Oct 2023Extension
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedExtension
Alterations to existing tiled roof to ground floor rear extension with rooflights, new first floor rear…
51, Saint Jarlath Road, Dublin 7, D07 R3P6
3112/22Dublin CityLodged 21 Jan 2022
- GrantedExtension
Planning permission is sought for the construction of a single storey extension to rear, 2 no. rooflights to…
2, Rathdown Crescent, Terenure, Dublin 6W
WEB1233/18Dublin CityLodged 15 May 2018
- GrantedExtension
Permission for ground floor and lower ground floor extensions to rear of existing dwelling along with…
Reenaroga , Rochestown Road , Monfieldstown
2039236Cork CityLodged 9 Apr 2020
- GrantedExtension
Permission for alterations and extensions to an existing dwelling including (1) A first floor level flat roof…
10 Upper Convent Road , Blackrock , Cork
2442614Cork CityLodged 22 Jan 2024
- GrantedExtension
Planning Permission is sought for (a) construction of a single storey extension to the rear and side (b) new…
33, Briarfield Grove, Kilbarrack, Dublin 5
2904/18Dublin CityLodged 2 May 2018
- Awaiting decisionExtension
Permission to construct a first floor extension to the rear of an existing 2 storey dwelling house with new…
21 Bellevue Heights , Frankfield , Cork
2443473Cork CityLodged 9 Dec 2024
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.