Planning Permission Ireland
RefusedChange of useDecided 25 July 2019

13/14, Merchant's Quay (Riverbank Building), Dublin 8, D08 KT61

Establishment of a Medically Supervised Injecting Facility and associated demolition works at Merchant's Quay.

4121/18 · Dublin City Council · Lodged 8 October 2018

Reference
4121/18
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
8 October 2018

Summary

AI-generated

The development comprises the demolition of an existing bathroom block, entrance ramp, and water tank to facilitate a new single-storey enclosed ramp entrance and a new single-storey bathroom block. It also includes the provision of a Medically Supervised Injecting Facility (MSIF) at the vacant basement level, featuring 7 injecting booths, clinical areas, and an intake space.

Change of usemedicaldemolitioncommunitycity centre
Floor area
489 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission is sought for development comprising
  • Demolition of existing bathroom block (c. 51m2) and reconfiguration of existing services area to provide new off street waiting area at ground floor level on eastern boundary with new access gate off merchant's quay and pergola canopy over
  • New single storey bathroom block (c. 77.5m2 gfa), reconfigured service yard with new escape stairs and new boundary wall to southern elevation and smoking area along eastern boundary
  • Demolition of existing entrance ramp and canopy on front elevation to merchant's quay to provide a new single storey enclosed ramp entrance (c. 24.7m2) and new entrance doors
  • The provision of a medically supervised injecting facility (msif) at existing vacant basement level (c. 387m2 gfa). The msif will be accessed via refurbished and covered passage from new gate at ground floor level on western elevation and will comprise an assessment/intake area, staff space, clinical area (comprising 7 no. Injecting booths), after care area, ancillary bathrooms, plant space and circulation areas
  • Demolition of existing water tank at roof level and redundant chimney and gas skid enclosure at western boundary
  • New backlit stainless steel signage (c. 5m2) on northern & eastern elevation, replacement glazing and general upgrade of materials/finishes on all elevations

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 12 July 2024.

Notified floor area: 1,190

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
15 Friary Close, Merchants Quay, DublinJul 2025€368,00037 m
3 Friary Close, Cook St Dublin 8, DublinSept 2025€355,00056 m
Apt 6, 13 High St, Dublin 8Mar 2025€375,000161 m
Apt 1, High Street, ChristchurchSept 2025€350,000161 m
35 Charles Street West, Upper Ormond Quay, Dublin 7Mar 2025€618,000163 m
4 Ushers Quay, Dublin 8, DublinDec 2025€1,050,000186 m
29 The Chandler, Aran Quay, Dublin 7Apr 2025€225,000194 m
2 Arran Quay, Dublin 7price excludes VATApr 2026€580,000197 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 October 2018
  2. Further information requested7 May 2019
  3. Further information received28 June 2019
  4. Decision due25 July 2019
  5. Decision issued25 July 2019
  6. Grant issued21 December 2022
  7. Appeal submitted23 August 2019
  8. Appeal decided21 December 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.