Planning Permission Ireland
GrantedCommercialDecided 2 October 2024

The Rotunda Hospital, Parnell Square, Dublin 1, D01P5W9

Construction of a temporary single-storey radiology unit at the Rotunda Hospital.

4130/24 · Dublin City Council · Lodged 8 August 2024

Reference
4130/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
8 August 2024

Summary

AI-generated

The project consists of a temporary 203 sqm radiology unit in the lower carpark of the Rotunda Hospital. It includes a link connection to the existing Admissions building and is located within the curtilage of protected structures.

Commercialhospitalmedicalprotected structure
Storey
1
Floor area
203 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure. The proposed development will consist of the construction of a single storey temporary radiology unit in the rotunda lower carpark, on a c. 0.076 ha site. The project includes a link connection to the existing admissions building and amendments to the façade of this building, where the new building abuts. The total proposed new building area is approx. 203 sqm. The proposed development is located within a conservation area and within the curtilage of the main rotunda hospital and the rotunda west wing building (no's 6419 and 6420 on the record of protected structures). The proposed development includes ancillary and associated site works.

Land-use zoning

What this land is zoned for

Z8: Georgian Conservation Areas
To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

National zoning type: General

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 5 August 2025.

Notified floor area: 203

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
30 Ivy Exchange, Parnell St, Dublin 1Feb 2026€450,000124 m
103 Ivy Exchange, Parnell St, Dublin 1Sept 2025€320,000124 m
42 Ivy Exchange, Parnell Street, Dublin 1Jul 2025€378,000124 m
55 Ivy Exchange, Parnell St, Dublin 1May 2025€350,000124 m
26 Ivy Exchange, Parnell St, Dublin 1Jun 2025€315,000124 m
71 Ivy Exchange, Parnell St, Dublin 1May 2025€435,000124 m
Apt 79, Ivy Exchange, Parnell St Dublin 1Feb 2025€349,900124 m
51 Ivy Exchange, Parnell St, Dublin 1Nov 2025€335,000124 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 August 2024
  2. Decision due2 October 2024
  3. Decision issued2 October 2024
  4. Permission expiry3 January 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.