Planning Permission Ireland
GrantedAlterationsDecided 6 September 2023

18, Morehampton Road, Dublin 4, D04 P2N5

Internal alterations and restoration works to a protected structure on Morehampton Road.

4146/23 · Dublin City Council · Lodged 13 July 2023

Reference
4146/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
13 July 2023

Summary

AI-generated

The development consists of internal alterations to the lower ground floor of a protected structure, including removing a partition wall and creating a new opening. It also includes installing a new kitchen, utility joinery, a new ensuite shower room on the first floor, and reinstating first-floor fireplaces.

Alterationsprotected structurerefurbishmentheritage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected strucure:permission for development at 18 morehampton road dublin 4, d04 p2n5, a protected structure (rps ref. No. 5303). The development will consist of alterations to lower ground floor layout including removal of existing partition wall, provision new door, formation of new opening between rooms, new glass partition in existing ope, new kitchen and utility joinery; provision of new ensuite shower room at first floor and reinstatement of first floor fireplaces.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 3, Morehampton Sq, DonnybrookNov 2025€410,00088 m
7 Morehampton Road, Dublin 4Sept 2025€2,188,00090 m
11 Morehampton Sq, Dublin 4, DublinMar 2026€600,000103 m
50 Morehampton Square, Morehampton Road, DonnybrookFeb 2025€538,000116 m
13 Pembroke Park, Ballsbridge, Dublin 4Oct 2025€2,400,000119 m
3 Hampton Court, Bloomfield Ave, Donnybrook Dublin 4Mar 2025€360,000120 m
52 Morehampton Rd, Donnybrook, Dublin 4Aug 2025€1,226,000138 m
86 Morehampton Sq, Donnybrook, Dublin 4May 2025€590,000145 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received13 July 2023
  2. Decision due6 September 2023
  3. Decision issued6 September 2023
  4. Permission expiry30 November 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.