Planning Permission Ireland
InvalidChange of useDecided 15 June 2022

c. 0.0054 Ha site on Abbey Cottages at the rear of Mellor Court, Nos. 19/23 Lower Liffey Street, Dublin 1

Retention of change of use from storage to workshop/storage, and permission for front window and internal alterations.

4152/22 · Dublin City Council · Lodged 3 June 2022

Reference
4152/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
3 June 2022

Summary

AI-generated

The application seeks retention for changing the use of a 47.71 sqm unit from storage to a part-workshop, part-storage space, including a separating wall. Permission is also sought for elevational changes to the front, including a new window and internal alterations.

Change of useretentionchange of useworkshop
Floor area
48 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission & retention: retention permission is sought for: the change of use of the unit (c. 47.71 sqm) from storage to part workshop, part storage; and the construction of a wall towards the north-west boundary separating the workshop/store room from a corridor. Permission is sought for elevational changes to the abbey cottages frontage including the provision of a new window; internal alterations to the existing layout; and all associated site and development works.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
198 Bachelors Walk, Dublin 1, DublinMar 2026€260,00074 m
Apt 307, Bachelors Walk, Dublin 1Mar 2026€293,50074 m
201 Bachelors Walk Apts, Liffey St Lower, Dublin 1Jul 2026€400,00074 m
265 Bachelors Walk, Dublin 1, DublinMar 2025€305,00083 m
213 Bachelors Walk, Dublin 1, DublinApr 2025€262,00089 m
Apt 215 Bachelors Walk, Norths Lotts, Dublin 1Jul 2026€257,00092 m
219 Bachelors Walk Apts, Dublin 1Oct 2025€254,00097 m
Apt 1, 38 Lower Ormond Quay, Dublin 1Dec 2025€2,100,000105 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 June 2022
  2. Decision due28 July 2022
  3. Decision issued15 June 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.