Planning Permission Ireland
GrantedApartmentsDecided 29 July 2022

Lands at the former Faulkners Industries Factory, Chapelizod Hill Road, Chapelizod, Dublin 20

Amendments to a permitted residential development in Chapelizod to add eight new apartments.

4156/22 · Dublin City Council · Lodged 7 June 2022

Reference
4156/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
7 June 2022

Summary

AI-generated

The proposal seeks to amend a previously permitted residential development at the former Faulkners Industries Factory. It includes an extension to Block A to accommodate 8 additional one-bedroom apartments across the third and fourth floors, along with modifications to balconies, terraces, and doorways.

Apartmentsapartmentsamendment
Residential units
8
Storeys
5

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for the amendment of a permitted development at lands at the former faulkners industries factory, chapelizod hill road, chapelizod, dublin 20, d20 we27; 'beann', 38 chapelizod hill road, chapelizod, dublin 20 d20 ty84; and 'clareville' 38d chapelizod hill road, chapelizod, dublin 20, d20 rk63. The proposed development will amend a previously permitted residential development granted under dcc reg. Ref. 2869/17 (abp reg. Ref. Pl29s. 248958); dcc reg. Ref. 3221/18; dcc reg. Ref. 3434/21; and dcc reg. Ref. 3134/22. The proposed development will include
  • An extension to the north-western corner of block a to include 8 no. Additional 1- bedroom units at 3rd and 4th floor level
  • Introduction of additional balcony and terrace doorways at ground floor level on the north elevation and fourth floor level north and south elevations of block a
  • Introduction of 2 no. Access doorways at ground floor level and 1 no. Access doorway at basement level on the east elevation of block b, and 4 no. Access doorways at ground floor level on the north elevation of block c
  • The relocation of previously permitted doorways and windows to match new internal layouts on ground to third floor level east elevation block a, ground floor east elevation, fourth floor north elevation and ground floor to fourth floor level west elevation block b, and third and fourth floor east elevation block c
  • The introduction of additional privacy screens to balconies at the southeast and northeast corners of block a, the northwest corner and fourth floor level southeast corner of block b1, and southwest corner of block c
  • The change in position of balconies on the north elevation and south elevation of block a, the omission of balconies at first, second and third floor level on the western elevation of block b2, and greater spacing between balconies for reasons of fire safety on the south elevation block c
  • Alterations to glazing at fourth floor level stairway on block a north elevation
  • New louvres at basement level east elevation block b
  • New columns at ground level north elevation block c
  • Alterations to external finishes on the north and east elevations of block c and the omission of green walls on the south elevation of block b1
  • Changes to internal layouts of apartments and circulation areas throughout all blocks to comply with fire safety regulations and disability access regulations, including minor changes to floor levels in blocks b and c
  • New access stairways at roof level blocks a and c
  • Revised layout and addition of solar panels at roof level of all blocks

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
112 Knockmaree, St Laurence Rd, Chapelizod Dublin 20Jun 2026€325,000166 m
108 Knockmaree, Chapelizoo, Dublin 20not full market priceDec 2025€405,000166 m
105 Block A2, Knockmaree Apts, ChapelizodMar 2025€415,000167 m
123 Knockmaree, Chapelizod, DublinJun 2025€420,000174 m
134 Knckmaree, Chapelizod, Dublin 20Oct 2025€436,000174 m
89 Knockmaree, St Laurences Rd, Chapelizod Dublin 20Mar 2026€372,000175 m
Apt 69, Knockmaree, St Laurences Rd Dublin 20Nov 2025€410,000184 m
20 Knockmaree, St Laurences Rd, Chapelizod Dublin 20May 2026€489,000222 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 June 2022
  2. Decision due29 July 2022
  3. Decision issued29 July 2022
  4. Grant issued12 September 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.