Planning Permission Ireland
RefusedApartmentsDecided 22 November 2023

61 Royal Canal Bank, Phibsborough, Dublin 7, D07 FY58

Addition of a fourth-floor setback apartment, bringing the block to five storeys and ten units.

4173/23 · Dublin City Council · Lodged 18 July 2023

Reference
4173/23
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
18 July 2023

Summary

AI-generated

Alterations to a previously approved development to add a fourth-floor setback level containing one additional two-bedroom apartment. This will result in a five-storey block containing ten apartments in total, along with three extra bicycle spaces.

Apartmentsapartmentsbicycle parkingsetback
Residential units
10
Storeys
5

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Alterations to the development previously approved under reg. Ref. 3251/22 comprising (i) provision of a fourth floor level setback that includes for 1 no. Additional two-bedroom apartment located to the rear of the development, served by private balcony; (ii) provision of 03 no. Additional bicycle parking spaces at ground level; (iii) all ancillary works necessary to facilitate the proposed development. The cumulative works will result in the provision of 5 storeys apartment block consisting of 10no. Apartments as follows; 2no. Studio units, 2no. One bedroom units and 6no. Two-bedroom units.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 17 March 2023.

Notified floor area: 1,132

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 Royal Canal View, Phibsborough, Dublin 7Mar 2025€245,32613 m
4 Royal Canal View, Phibsborough, Dublin 7Mar 2025€266,67413 m
7 Royal Canal View, Phibsborough, Dublin 7Mar 2025€266,67313 m
6 Royal Canal View, Phibsborough, Dublin 7Mar 2025€256,00013 m
1 Royal Canal View, Phibsborough, Dublin 7Jan 2025€234,67413 m
10 Royal Canal View, Phibsborough, Dublin 7Mar 2025€330,65313 m
1 Royal Canal Bank, Phibsborough, Dublin 7Mar 2025€515,00029 m
3 Royal Canal Court, Phibsborough, Dublin 7Jan 2025€420,00043 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 July 2023
  2. Decision due22 November 2023
  3. Decision issued22 November 2023
  4. Appeal submitted19 December 2023
  5. Appeal decided15 July 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.