Planning Permission Ireland
RefusedNew dwellingDecided 18 December 2024

84 Northumberland Road, Ballsbridge, Dublin 4, D04PY94

Amendments to a previously permitted new house behind a protected structure in Ballsbridge.

4377/24 · Dublin City Council · Lodged 31 October 2024

Reference
4377/24
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
31 October 2024

Summary

AI-generated

The application seeks to amend a previous permission for a new house on Lansdowne Park, located to the rear of a protected structure. Amendments include reducing the overall height, relocating the vehicular entrance, and minor alterations to elevations and layout.

New dwellingprotected structureinfillamendment
Residential unit
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: to amend a previous permission (5320/22) for provision of a new house on lansdowne park located to the rear of no. 84 northumberland road (a protected structure), ballsbridge, dublin 4, d04 py94. The proposed amendment includes the following -reductions in the overall height of the proposed building (in accordance with the compliance conditions to permission 5320/22), relocation of the vehicular entrance/access by way of improvement of front boundary treatment to lansdowne park, minor alterations to the front and rear elevations as well as floor layout configurations within the permitted footprint and reconfiguration of site layout to achieve increased daylighting of outdoor spaces.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
96 Lansdowne Park, Ballsbridge, Dublin 4Feb 2025€500,00051 m
32 Lansdowne Park, Ballsbridge, Dublin 4Feb 2025€767,00086 m
12 Lansdowne Park, Ballsbridge, Dublin 4not full market priceMay 2026€460,000139 m
8 Lansdowne Crescent, Ballsbridge, Dublin 4Jul 2025€745,000141 m
108 Baggot Lane, Dublin 4Jan 2026€820,000141 m
4 Haddington Sq, Haddington Rd, Ballsbridge Dublin 4Jan 2025€445,000144 m
Apt 3 The Templeton, Lansdowne Place, Ballsbridgeprice excludes VATJun 2025€713,625145 m
6 The Templeton, Landsdowne Place, BallsbridgeAug 2025€1,550,000145 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received31 October 2024
  2. Decision due3 January 2025
  3. Decision issued18 December 2024
  4. Appeal submitted23 January 2025
  5. Appeal decided9 May 2025
  6. Permission expiry22 September 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.