The Old Storehouse, 3 Crown Alley, Dublin 2, and to the rear of 8 Cope Street, Dublin 2

Retention and permission for a storage building and associated demolition works in Temple Bar.

4412/24 · Dublin City Council · Lodged 22 November 2024

Reference
4412/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 November 2024

Summary

AI-generated

The application seeks retention and permission for a two-storey storage building with an undercroft and vaulted cellars. It also seeks retention for the demolition of various roof, wall, and internal structures, alongside the retention of newly constructed rooflights.

Retentionretentiondemolitioncommercial
Storeys
2
Floor area
98 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Retention and permission in respect of a two- storey storage building (69 sqm) with undercroft, located in a yard (with vaulted cellars (29 sqm) below) to the rear of the old storehouse, 3 crown alley. Dublin 2, and to the rear of 8 cope street. Dublin
  • Retention is sought for executed demolition of. A) mono-pitch corrugated metal roof and flashings on timber rafters and ceiling joists below, b) first floor brick gable wall on northern boundary, c) yard façade wall at ground and first floor built of random-rubble, brick, and concrete block plus rainwater goods d) external concrete stairs, landing box-metal handrail and double-door timber enclosure below, e) 2 no, window openings with concrete cills, timber window frames and casements, one with metal security grill on inner face, f) first floor timber entrance door and frame in external stud wall of timber cladding on timber stud with 1 no. Window of fixed pane and two casements and rainwater goods, ( g ) ground floor entrance door, frame and wall, h) internal flush-doors, architraves plasterboard-finished timber stud walls and ceilings. Plus, for retention of executed construction of: i) 3 no. Double glazed rooflights and mono- pitch felt roof, timber rafters and wall plate, lead flashings, and rainwater goods, j) northern boundary gable wall reinstated at first floor in concrete block, k) new yard façade of concrete block-backed walls faced in salvaged and supplemented random-rubble stone and brick with segmented brick arch heads to 2 no. Window openings, i) new yard façade brick wall with segmented salvaged brick arch heads to 2 no. Window openings and 2 no. Stone cills, m) first floor steel columns and beam support to roof, n) ground level new yard façade timber beam- effect cladding at undercroft and over 2 no. Openings with timber cills below. Also, permission is sought for development to complete the works to include: o) stone parapet copings to façade to yard and to northern boundary gable wall, p) external render and lead flashings to first floor northern boundary gable blockwork, (q) first floor 2 no. Stone window cills and 4 no. Double-glazed timber sliding-sash windows, r) at ground floor reduce 2 no. Openings with infill insulated timber stud wall with stained t&g timber cladding boards to form 2 no. Casement timber window openings, and 1 no. Flush timber door, s) removal of temporary internal timber open-riser ladder staircase and handrail and closing-up of the stairwell opening, t) making of new internal stairwell opening in first floor and fitting of new timber staircase and handrails, u) first floor repair and renewal of structural timbers and floorboards over, v) new walls, doors, and ceilings, ventilated dry-lining, thermal insulation and fire protections, w) mechanical and electrical services. Plus all associated works

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 7, Temple Bar Sq, Dublin 2Jun 2026€465,00043 m
Apt 6 Temple Bar Sq, Dublin 2, DublinDec 2025€330,00043 m
Apt 1, 3 4 Cope St, Dublin 2Oct 2025€2,250,00056 m
The Friary, Cecilia St, Temple Bar Dublin 2Dec 2025€266,66680 m
Top Floor Apt., 5a Fownes Street Upper, Temple BarOct 2025€250,00089 m
Apt 1 Aston Court, Bedford Row, Dublin 2Apr 2025€421,000100 m
5 Aston Court, Bedford Row, Dublin 2Oct 2025€950,000100 m
Apt 10 Aston Court, Bedford Row, Temple BarMay 2025€397,000100 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 November 2024
  2. Decision due24 January 2025
  3. Decision issued27 November 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.