Planning Permission Ireland
GrantedExtensionDecided 30 January 2019

24, Annesley Place, North Strand, Dublin 3

Demolition of a rear extension and construction of a new two-storey extension and attic conversion in North Strand.

4475/18 · Dublin City Council · Lodged 27 November 2018

Reference
4475/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
27 November 2018

Summary

AI-generated

The project involves the demolition of an existing single-storey rear extension and the construction of a new 33.5 sqm two-storey flat roof extension. It also includes converting the attic space into a study room with a new rooflight and staircase.

Extensionextensionattic conversiondemolition
Floor area
49 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission is sought for extension and alterations to the existing dwelling house. The proposed works will incorporate: (a) demolition of existing single-storey extension to rear; (b) construction of a new two-storey flat roof extension to rear of the existing house (33.5 sqm); (c) alterations to the existing two-storey return to include a new roof; (d) conversion of the attic space to a study room (15 sqm) with 1 no. New rooflight to rear in existing pitched roof and new attic staircase; (e) associated demolitions and internal layout alterations; (f) all associated drainage, landscaping and site works; (g) alterations to the existing side gate and side wall on enaville avenue all at no. 24 annesley place, north strand, dublin 3.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
14 St Patricks Avenue, North Strand, Dublin 3May 2025€225,00050 m
17 St Patricks Avenue, North Strand, Dublin 3Feb 2025€241,00051 m
31 Annesley Ave, Dublin 2, DublinApr 2025€325,00056 m
12 Enaville Ave, Ballybough, Dublin 3Jan 2025€262,00061 m
106 Strand Rd North, Dublin 3, DublinJul 2025€354,16693 m
Flat 1, 107 North Strand Rd, Dublin 3May 2025€540,00096 m
108 North Strand Rd, Business Unit, Dublin 3May 2025€540,00097 m
Apartment 2, 18 Nottingham Street, Dublin 3price excludes VATSept 2025€382,500134 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 November 2018
  2. Decision due30 January 2019
  3. Decision issued30 January 2019
  4. Grant issued7 March 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.