Planning Permission Ireland
GrantedAlterationsDecided 2 February 2024

44 Heytesbury Street, Portobello, Dublin 8, D08 C2P5

Internal and external alterations, including a new semi-basement storage space, to a protected house in Portobello.

4511/23 · Dublin City Council · Lodged 20 September 2023

Reference
4511/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
20 September 2023

Summary

AI-generated

The development at this protected structure includes internal reconfiguration and partial wall removal. It also features excavation of the front garden for a new semi-basement storage space, garden reconfiguration, and a new glass canopy over the existing rear extension.

Alterationsbasementcanopyrenovation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: the application consists of the following works
  • Internal reconfiguration including the partial removal of two internal structural walls, relocation of an existing internal door and installation of lightweight partition wall
  • Excavation to front garden and construction of new semi-basement storage space
  • Reconfiguration of front and rear garden
  • Installation of timber-framed glass canopy to existing rear extension
  • All associated external works required to be undertaken as part of the development

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
50 Heytesbury St, Portabello, Dublin 8May 2026€965,00041 m
60 Heytesbury St, Dublin 8, DublinJan 2025€785,00047 m
52 Heytesbury Street, Portobello, Dublin 8Dec 2025€1,450,00054 m
32 Heytesbury St, Circular Rd South, Dublin 8Nov 2025€1,780,00081 m
40 Curzon St, South Circular Rd, Dublin 8Dec 2025€795,00086 m
10 South Circular Road, Dublin 8Oct 2025€920,00087 m
1 Curzon St, South Circular Rd, Dublin 8Oct 2025€1,015,00093 m
Flats 1-6, 20 South Circular Rd, Dublin 8Jun 2025€760,000100 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 September 2023
  2. Decision due6 February 2024
  3. Decision issued2 February 2024
  4. Permission expiry26 April 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.