Planning Permission Ireland
GrantedChange of useDecided 15 February 2019

Rear of 195-198 Pearse Street, Dublin 2 at House 47 within the campus of Trinity College Dublin, Dublin 2.

Change the use of a ground floor space from a health centre to university use at Trinity College Dublin.

4643/18 · Dublin City Council · Lodged 17 December 2018

Reference
4643/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
17 December 2018

Summary

AI-generated

The application seeks a change of use from a health centre to university use at ground floor level (approximately 244 sqm) at House 47 within the Trinity College campus. The site is located to the rear of protected structures at 195-198 Pearse Street.

Change of usechange of useuniversityprotected structure
Floor area
244 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: the provost, fellows, foundation scholars and other members of the board of the college of holy and undivided trinity of queen elizabeth near dublin, intend to apply for permission for development at this site which consists of change of use from health centre use to university use at ground floor level (c. 244sqm) located to the rear of no. S 195 to 198 pearse street, dublin 2 at house 47 (fronting the rugby pitch) within the campus of trinity college dublin, dublin
  • No. S 196 to 198 pearse street, dublin 2 are protected structures

Land-use zoning

What this land is zoned for

Z8: Georgian Conservation Areas
To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

National zoning type: General

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
57 Hyde Court, Townsend St, Dublin 2Jun 2026€585,000148 m
62 Hyde Court, Townsend St, Dublin 2Feb 2025€477,000148 m
43 Hyde Court, Townsend St, Dublin 2Nov 2025€520,000148 m
Apt 38, Hyde Court, Townsend St Dublin 2May 2025€546,000148 m
65 Hyde Court, Townsend Street, Dublin 2Nov 2025€370,000148 m
59 Hyde Court, Townsend St, Dublin 2Jul 2026€655,000148 m
25 Trinity Plaza, Townsend St, Dublin 2Aug 2025€518,000157 m
33 Trinity Plaza, Tara St, Dublin 2Jul 2025€250,000157 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received17 December 2018
  2. Decision due19 February 2019
  3. Decision issued15 February 2019
  4. Grant issued25 March 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.