Planning Permission Ireland
RefusedInfrastructureDecided 12 February 2020

The Castle Hotel, 1-4 Gardiner Row, Dublin 1.

Installation of telecommunications antennas and dishes on the roof of a protected hotel structure.

4660/19 · Dublin City Council · Lodged 10 December 2019

Reference
4660/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
10 December 2019

Summary

AI-generated

Planning permission is sought to install 3 antennas and 2 transmission dishes on supporting poles, along with equipment cabinets and cabling, on the roof of The Castle Hotel. The hotel is a protected structure, and the installation will form part of the Eir Mobile network.

Infrastructuretelecomsprotected structureantenna

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: planning permission to install 3 no. Antenna and 2 no. Transmission dishes on supporting poles together with equipment cabinets, cabling and associated site works at the roof level of the castle hotel, 1-4 gardiner row, dublin 1, protected structures in the dublin city development plan 2016-2022. The installation will form part of eir mobile telecommunications network.

Land-use zoning

What this land is zoned for

Z8: Georgian Conservation Areas
To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

National zoning type: General

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 5, Fredrick Sq Appartments, Fredrick Lane Dublin 1Aug 2025€380,000103 m
Apt 25, Frederick Court, 9 Frederick Lane NorthAug 2025€430,000103 m
Flat 1 Side Entrance, 37 Upper Dorset Street, Dublin 1Mar 2026€1,420,000141 m
Apartment 1 41 Dorset St Upper, Dorset St, Dublin 1Nov 2025€890,000147 m
Apartment 3 The Mews, Mount Eccles Court, North Great Georges StreetDec 2025€375,000199 m
Apartment 4, Sackville Court, Blessington StreetApr 2025€235,000207 m
Apt 9, Sackville Court, Blessington St Dublin 7Jan 2025€235,000207 m
13 Sackville Court, Blessington St, Dublin 1Jan 2025€233,000207 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 December 2019
  2. Decision due12 February 2020
  3. Decision issued12 February 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.