Planning Permission Ireland
GrantedNew dwellingDecided 14 February 2020

138, Walkinstown Avenue, Walkinstown, Dublin 12

Demolition of a single-storey house to build three terraced houses with parking and a bike shed.

4684/19 · Dublin City Council · Lodged 12 December 2019

Reference
4684/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
12 December 2019
Residential units
3

Summary

AI-generated

The development will consist of the demolition of the existing single-storey house. It will be replaced with three terraced houses, including two two-storey houses with attic conversions and one two-storey house. The project also includes widening the driveway, three parking bays, and a bicycle shed with solar panels.

New dwellingdemolitionresidentialsolar
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of demolition of existing single storey house and replace with 3 no. Terraced houses with 2 no. Rooflights to the front. The first two houses are 2 storeys with attic conversions and 3 no. Bedrooms. The end of terrace house is 2 storeys with 2 no. Bedrooms. The existing driveway opening will be widened from 2.76 metres to 3.96 metres with 3 no. Parking bays, electric car charging point and timber frame bicycle shed with solar panels on roof. New perimeter walls, permeable paving and associated site works.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 2 August 2024. A completion certificate was lodged on 25 June 2025.

Notified floor area: 125

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
124 Walkinstown Ave, Walkinstown, Dublin 12Jun 2025€403,00071 m
2c Ballymount Sq, Walkinstown, Dublin 12Jul 2025€376,00080 m
Apartment 4 Block B, Ballymount Square, WalkinstownSept 2025€351,00083 m
19a Ballymount Sq, Walkinstown, Dublin 12Apr 2025€392,000116 m
C 1 Ballymount Sq, Ballymount Rd, Walkinstown Dublin 12Jan 2025€335,000123 m
102 Walkinstown Ave, Walkinstown, Dublin 12Aug 2025€497,000126 m
8 Cromwells Fort Rd, Walkinstown, Dublin 12Aug 2025€565,000155 m
11 Greenhills Road, Walkinstown, Dublin 12Mar 2026€635,000164 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received12 December 2019
  2. Decision due14 February 2020
  3. Decision issued14 February 2020
  4. Grant issued17 April 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.