Planning Permission Ireland
GrantedCommercialDecided 15 February 2019

Block I, East Point Business Park, Alfie Byrne Road, Dublin 3

Alterations to an office building including two new glazed atria extensions, facade replacement, and roof solar panels.

4689/18 · Dublin City Council · Lodged 20 December 2018

Reference
4689/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
20 December 2018

Summary

AI-generated

Planning permission is sought for alterations to an existing business park building. The works include constructing two new glazed and timber atria extensions in external courtyards, replacing part of the glazed facade, installing roof plant, and adding solar hot water and photovoltaic panels.

Commercialofficesolarextension

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission is sought for alterations to the existing building, including the construction of 2 no. New glazed and timber atria extensions within the existing external courtyards on south elevation, the part replacement of the building's glazed facade (including the removal of all existing bris solei), removal existing entrance lobby to be replace by new, erection of security control posts at entrance doors, adjustment of roof mounted louvres to allow for additional roof plant space along with associated plant installation, installation of solar hot water panels and photovoltaic panels to roof. The construction of one external bicycle shelter and waste management area and all other associated site works.

Land-use zoning

What this land is zoned for

Z6: Employment/EnterpriseSI
To provide for the creation and protection of enterprise and facilitate opportunities for employment creation.

National zoning type: Industrial, enterprise, employment

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
148 East Wall Rd, East Wall, Dublin 3Jun 2026€382,000334 m
172 East Wall Rd, Dublin 3, DublinOct 2025€116,667348 m
25 Forth Rd, East Wall, DublinJun 2026€475,000365 m
202 East Wall Rd, Dublin 3, DublinAug 2025€200,000389 m
67 Bargy Rd, East Wall, Dublin 3Feb 2026€381,000397 m
Apt 32, The Lighthouse, Church Rd Dublin 3Jul 2025€310,000406 m
65 The Lighthouse Apts, Church Rd East Wall, Dublin 3Jan 2025€410,000406 m
58 The Lighthouse, Church Rd, East Wall Dublin 3Jul 2025€306,000406 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 December 2018
  2. Decision due22 February 2019
  3. Decision issued15 February 2019
  4. Grant issued25 March 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.