GrantedChange of useDecided 29 July 2024

Former New Ireland premises, 9-12, Dawson Street, Dublin 2

Extension of duration for office upgrades and a new restaurant on Dawson Street.

4716/18/X1 · Dublin City Council · Lodged 6 June 2024

Reference
4716/18/X1
Authority
Dublin City Council
Register status
Decided
Received
6 June 2024

Summary

AI-generated

An extension of duration is sought for works to a protected structure. The development includes upgrading upper-floor offices, introducing basement cycle facilities, and changing the use of the ground floor of No. 9-10 and the rear of No. 11-12 from office to a licensed restaurant.

Change of userestaurantofficeprotected structurechange of use
Floor area
852 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Ext. Of duration: protected structure: the premises consists of building a (a 1930s building bounded by dawson lane and to rear of no. 11-12), building b (a 1964 building facing dawson street and dawson lane, to the front of no. 11-12) and building c (a 1971 building, no. 9-10 dawson street). No. 11-12 and the facade only of no. 9-10 are proposed protected structures. The development involves the continued use of the basement for plant and car parking with access from dawson lane and introduces cycle parking, storage, shower and locker facilities. A change of use of the ground floor of no. 9-10 dawson street and rear of no. 11-12 dawson street from office use to licensed restaurant use is proposed totalling 851.7m. 2 the existing office entrance at no. 11-12 is to be upgraded including recovery and reinstatement of double height entrance hall and will be used as access foyer to offices on the upper floors which use shall be retained. It is proposed to upgrade the existing office areas in no. 11-12 at 1st to 4th floor levels, including demolition of section of wall, removing existing screens, partitions, core areas and installing new cores including lifts, stairs and staff facilities and infilling of light well. Demolish parts of existing floor areas, and existing stair cores, screens and partitions at 1st to 4th floor area in the part of no. 9-10 not proposed for protection and construct replacement rear extension (of 2,476m2) and create new stairs, lifts cores and staff facilities, to create open plan areas for continued office use, at 1st
  • 4th floor level in all buildings. Remove existing office area over no. 9-10 and plant over no. 11-12 and replace with setback office area with stair cores, lifts and staff facilities at 5th floor level above all buildings. Remove plant area above no. 9-10 and replace with setback office area with stair cores, lifts and staff facilities at 6th floor level over all buildings. Provide new green roof, solar panels and plant at roof level and esb substation at rear at ground floor on dawson lane. The proposal includes revised and upgraded elevations to dawson street and dawson lane involving the recovery of external original details, fenestration patterns with improved thermal performance. The proposed works will provide for additional interconnection between buildings, structural upgrade works, upgrade works to improve the fire safety standards and servicing requirements of the buildings with provision of new service core to meet current regulatory requirements for office use. Works will include repair and renewal of decorations and finishes throughout. Total floor area at present is 6,731.1m2 and at completion will be 9,207.8m2. The buildings will have two set back floor areas over five floors with basement, eight floors in all

Key dates

Timeline

  1. Application received6 June 2024
  2. Decision due31 July 2024
  3. Decision issued29 July 2024

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.