Planning Permission Ireland
GrantedCommercialDecided 26 October 2022

Northside Shopping Centre, Oscar Traynor Road, Dublin 17

New entrance canopies and updated branding signage are planned for Northside Shopping Centre.

4786/22 · Dublin City Council · Lodged 6 September 2022

Reference
4786/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
6 September 2022

Summary

AI-generated

The proposed works consist of installing new branding and illuminated signs at the three pedestrian entrances, alongside two new freestanding metal glazed canopies. Minor updates include painting existing signage totems and removing old vertical lettering.

Commercialsignagecanopyretail
Floor area
35 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist/consists of new branding/advert signs to the south west, south east and north-west elevations including new signage lighting to match existing; new corporate signs with backlit metal and translucent polyurethane letters to replace obsolete existing signs at the 3 existing pedestrian entrances; new freestanding metal glazed canopy (approximately 15.70 sqm) at the oscar traynor road entrance including concealed surface water drainage to be connected to existing system; new freestanding metal glazed canopy (approximately 18.82 sqm) at the barryscourt road entrance including concealed surface water drainage to be connected to existing system, partial re-paint of the two existing signage totems with colour scheme matching the existing; removal of the vertical lettering on the east corner of the building.

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
6 Barryscourt Rd, Coolock, Dublin 17Jun 2026€300,000167 m
15a Cromcastle Rd, Coolock, Dublin 5Dec 2025€460,000249 m
58 Cromcastle Dr, Kilmore, Coolock Dublin 5Jan 2025€388,000251 m
53 Cromcastle Drive, Kilmore West, CoolockMay 2026€400,000279 m
25 Riverside Crescent, Clonshaugh, Dublin 17not full market priceJul 2025€220,000282 m
5 Adare Dr, Coolock, Dublin 5Nov 2025€411,000282 m
21 Cromcastle Rd, Kilmore Dublin 5, DublinAug 2025€455,500288 m
49 Riverside Rd, Coolock, Dublin 17May 2025€380,000298 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 September 2022
  2. Decision due28 October 2022
  3. Decision issued26 October 2022
  4. Grant issued6 December 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.