Planning Permission Ireland
Part granted, part refusedRetentionDecided 30 January 2024

Circle K, 20/21 Westmoreland Street, Dublin 2, D02 X677

Retention of internal Subway signs and permission for new Circle K shopfront signage.

4875/23 · Dublin City Council · Lodged 29 November 2023

Reference
4875/23
Authority
Dublin City Council
Register status
Decided
Type
Retention Permission
Received
29 November 2023

Summary

AI-generated

The application seeks permission to replace existing overhead signage with new backlit Circle K branding and projecting signs. It also seeks retention permission for three existing illuminated Subway signs located inside the shop windows.

Retentionsignageshopfrontretail

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission/ retention: planning permission sought for (1) the removal of existing overhead light fittings and window vinyl displays, (2) the replacement of existing overhead signage with new 400mm individually mounted, stainless steel backlit circle k branded signage across both shop fronts, along with westmoreland street and off licence lettering at fascia level, (3) 2no. New internally illuminated circle k projecting signs affixed to the eastern and western elevations at fascia level, (4) all associated site development works. Permission for retention is sought for the retention of 3no. Existing internally illuminated subway branded signs located inside shop windows below fascia level.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 3 Lafayette Building, 1 5 Dolier St, DublinOct 2025€400,00057 m
Apt 2 Aston Buildings, Aston Quay, Dublin 2May 2025€390,00079 m
Apt 330, Bachelors Walk, DublinFeb 2025€285,000107 m
Apt 3, 10 Aston Abbey, 10 Aston KeyJan 2025€290,000108 m
31 Batchelors Walk, Ashbourne, Co. MeathSept 2025€486,000114 m
171 Batchelors Walk, DublinJan 2026€277,000140 m
Apt 140 Bachelors Walk, Bachelors Walk, Dublin 1Mar 2026€312,500140 m
Apartment 401, 5 - 9 Eden Quay, Dublin 1Nov 2025€490,000149 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 November 2023
  2. Decision due1 February 2024
  3. Decision issued30 January 2024
  4. Permission expiry18 April 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.