Planning Permission Ireland
GrantedChange of useDecided 28 June 2023

1, 3, 5, 7, 9 Tara Street & 5, 6, 7 George's Quay, Dublin 2

Change of use of buildings on Tara Street and George's Quay to a bar and foodhall with 13 food and drink units.

5042/22 · Dublin City Council · Lodged 14 October 2022

Reference
5042/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
14 October 2022

Summary

AI-generated

The development proposes changing the use of existing buildings to create a bar and foodhall featuring 13 separate food and drink units. It includes retaining and refurbishing the facades, altering the internal layout, extending the basement, and constructing a new roof terrace with a permanent roof and retractable awnings.

Change of usefoodhallbarterraceredevelopment

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development will consist of: change of use of the existing buildings to provide a bar and foodhall which consists of 13 separate units serving food/ drinks. Retention and refurbishment of the existing facades and alteration to the internal layout of the buildings to create one building with seating/dining/service/bathroom/ancillary areas associated with the operation of the proposed new use. Alteration and extension of the basement to provide ancillary facilities. Construction of a new associated roof terrace area, including new permanent roof over part of the terrace, along with an open area with retractable awnings. The proposal also includes all associated works to enable the development of the proposal.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
29 Apt 2, Georges Quay, Dublin 2Oct 2025€410,00026 m
Apt 21, 2 Georges Quay, Dublin 2May 2025€431,00026 m
63 Corn Exchange, Poolbeg St, Dublin 2Sept 2025€701,00096 m
43 Corn Exchange, Poolbeg St, Dublin 2Mar 2025€411,00096 m
29 Corn Exchange, Poolbeg St, Dublin 2Jun 2025€290,00096 m
32 Corn Exchange, Poolbeg St, Dublin 2Sept 2025€395,00096 m
34 Corn Exchange, Poolbeg St, Dublin 2Sept 2025€422,50096 m
Apt 13, Corn Exchange, Poolbeg St Dublin 2May 2026€340,00096 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received14 October 2022
  2. Decision due29 June 2023
  3. Decision issued28 June 2023
  4. Permission expiry22 September 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.