Planning Permission Ireland
GrantedCommercialDecided 11 January 2023

17, Portobello Dock, Portobello Harbour, Dublin 8, D08 E1V7

Installation of new illuminated and non-illuminated signage on a hotel currently under construction.

5192/22 · Dublin City Council · Lodged 8 November 2022

Reference
5192/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
8 November 2022

Summary

AI-generated

The application seeks permission for minor amendments to a permitted hotel development. Works include the installation of multiple wall-mounted illuminated and non-illuminated signs, vinyl glazing logos, and the relocation of an approved revolving door.

Commercialhotelsignage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission is sought for development relating to a previously permitted hotel development (dublin city council reg. Ref. 4284/17) currently under construction at 17 portobello dock, portobello harbour, dublin 8, d08 e1v7 (0.13ha). The proposed development will consist of
  • On the southern elevation: a) the erection of a wall mounted internally illuminated sign (5.3 high by 1.01m wide)
  • On the eastern elevation: a) the erection of 2 no. Wall mounted internally illuminated signs (0.92 high x 11.15m wide and 2.4 high x 1.8m wide); b) the erection of
  • No non-illuminated signs (0.6 high by 0.6m wide); c) the placing of 4 no. Vinyl glazing logos (0.21m high x 0.27m wide) on the glazing of the revolving door at ground floor level; and, d) the re-location of the approved revolving door and pass door at ground floor level
  • The development will also consist of any works necessary to facilitate the development

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
23 Portobello Quay, Portobello Harbour, Dublin 8May 2026€525,00025 m
21 Portobello Quay, Portobello, Dublin 8Aug 2025€600,00039 m
23 Portobello Dock, Portobello Harbour, Dublin 8Aug 2025€514,00042 m
Apt 7, Portobello Dock, Portobello HarbourJun 2025€295,00042 m
Apt 17 Portobello Dock, Portobello Harbour, Dublin 8Mar 2025€410,00042 m
14 Portobello Dock, Portobello Harbour, Dublin 8Jun 2025€352,00042 m
Apt 12, Portobello Dock, Portobello Dublin 8Jul 2025€470,00042 m
1 Portobello Quay, Portobello, Dublin 8Jun 2026€520,00045 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 November 2022
  2. Decision due11 January 2023
  3. Decision issued11 January 2023
  4. Grant issued22 February 2023

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.