Planning Permission Ireland
InvalidApartmentsDecided 28 November 2022

55-56, Talbot Street, Dublin 1

Addition of two storeys to create three new apartments above commercial units on Talbot Street.

5243/22 · Dublin City Council · Lodged 17 November 2022

Reference
5243/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
17 November 2022

Summary

AI-generated

The development involves demolishing the existing roof and constructing two additional floors to create a five-storey building. This will provide three new apartments (bringing the total to five), alongside extensions, reconfigurations, and new private and communal terraces.

Apartmentsapartmentsdemolitionextensionurban regeneration
Residential units
3
Storeys
5

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of alterations and modifications to the existing building which has commercial units at ground floor and basement and 2 apartments at 1st and 2nd floors as follows: (1) the demolition of the roof and attic space and the construction of over two additional levels facing, and set back from talbot street, resulting in a building of five storey including ground floor. (2) the provision of 3 additional apartments on site resulting in 5 units: (a) extension to the rear and reconfiguration of existing 2-bed apartments at first and second floor. (b) construction of a new studio apartment to the rear of first floor, on the existing rear flat roof, (c) provision of a new 2-bed apartment on the new third floor, (d) provision of 1-bed apartment on the new fourth floor. (3) demolition of pitched roof to the rear, (4) provision of private and communal amenity space: (a) provision of communal amenity space to the rear on the first floor level with new access lobby, (b) provision of private balconies and private terraces to the rear of residential units, (c) provision of private terrace to the new apartment on fourth floor facing talbot street, (5) all associated site works.

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 1 3, 3a, Talbot Stnot full market priceApr 2025€265,00031 m
Flat 1, 46 Talbot Street, Dublin 1Mar 2025€535,00040 m
48 Amiens Sq, Amiens St, Dublin 1Jan 2026€375,00043 m
Apt 45 Amiens Square, Amiens St, Dublin 1Jun 2026€380,00043 m
17 Amiens Sq, Amiens St, Dublin 1May 2025€335,00043 m
24 The Millhouse Block C, The Steelworks, Foley St Dublin 1Nov 2025€387,000121 m
Apt 37, The Millhouse, Foley St Dublin 1Sept 2025€300,000132 m
Apt 4, The Millhouse, Steelworks Dublin 1Jul 2026€271,000132 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received17 November 2022
  2. Decision due20 January 2023
  3. Decision issued28 November 2022

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.